Loading...
WA9701-CS060118 T H E · C I T Y · O F COPFELL P.O. Box 478 255 Parkway Bird Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO VER SHEET To: Doug Showers From: Suzan Taylor Fax: 214-361-0204 Date: January 18, 2006 Project No: WA 97-01 Pages: 3 (including cover sheet) Re: Change Order #1 cc: [] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested .Comments: Doug: Attached is a copy of change order no. Water Line project. Suzan Taylor CIP Coordinator Direct: 972-304-7019 1 on the Denton Tap Road IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City qf Coppell Engineering Excellence By Design" CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: City of Coppell CHANGE ORDER NO.: One (1) Belt Line/Denton Tap 16-Inch Water Line Project #WA 97-01 JT. Dersner, Inc. DATE: January 4, 2006 ADD: Item # Description Quantil3' Unit Unit Price New 12' PVC Water 100 LF 45.65 New 12' Gate Valve 2 EA 1,450.00 t2 6" Gate Valve 1 EA 800.00 13 Std Fire Hydrant 1 EA 1,675.00 New Fire Hydrant Ext 4 VF 600.00 New 16" x I2" Tee I EA 450.00 New 12" x 6" Tee 1 EA 295.00 New 12' Solid Sleeve 1 EA 250.00 Total Revision to Contract Amount Previous contract amount ~h Net increase in contract amount ( ange Ord. #1 Revised contract amount Net increase m contract time o£completion Revised Contract time of completion Total 4,565.00 2,900.00 800.00 1,675.00 2,400.00 450.00 295.00 250.00 $13,335.00 $791,659.50 $13,335.00 $804,994.50 ;N/A The contractor hereb? accepts this Contract adjustment as a final and complete adjustment in Full accord and satisfaction of all past and fi~ture liability originating under any clause in the Contract by reason of'this revision to thc Contract. Recommendlcd by City Engineer Date Accepted b) Git.,,' Date Agrecd to by Contractor r/ate / J. T. Dersner, Inc. 2101E. Shady Grove I~ing, Texas 75060 Phone:(972) 421-0930 Fax:(972)421-0934 Mr. Rick O'Dell City of Coppell Engineering Dept 255 Parkway Boulevard Coppell, Texas 75019 Phone: 972-304-7090 December 27, 2005 Ref: Denton Tap 16" Water Line Sub: Change Order Request #1_'~/ Extra Work at Tine in South of Airline DESCRIPTION QUANTITY MIS UNIT TOTAL TOTAL 12"PVC Water 100 If $ 45.65 $ 4,56500 12" Gate Valve t~ -~ ,/' ea $ 1,450.00 $ 't~rSe:O0 6" Gate Valve I ea $ 750.00 $ ~ Std Fire Hydrant 1 ea $ 1,500.00 $ ,~ ~-¢~ ~r~ Fire Hydt Extension 4 vf $ 600.00 $ 2,400.00 16"x12" Tee 1 ea $ 450.00 $ 450.00 12'~(6" Tee I ea $ 295.00 $ 295.00 12" Solid Sleeve I ea $ 250.00 $ 250.00 $ -,_~ TOTAL $ 1..1-¢60.00 Replace Defective 12" Gate valve (if required) DESCRIPTION QUANTITY I MIS UNIT TOTAL TOTAL 12'' Gate Valve 1 I ea $ 1,450.00 $ 1,45000 $ TOTAL $ 1,450.00 12J29/"2005 I