Doug:
Attached is a copy of change order no.
Water Line project.
Suzan Taylor
CIP Coordinator
Direct: 972-304-7019
1 on the Denton Tap Road
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679
"City qf Coppell Engineering Excellence By Design"
CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT:
CONTRACTOR:
OWNER: City of Coppell
CHANGE ORDER NO.: One (1)
Belt Line/Denton Tap 16-Inch Water Line Project #WA 97-01
JT. Dersner, Inc.
DATE: January 4, 2006
ADD:
Item # Description Quantil3' Unit Unit Price
New 12' PVC Water 100 LF 45.65
New 12' Gate Valve 2 EA 1,450.00
t2 6" Gate Valve 1 EA 800.00
13 Std Fire Hydrant 1 EA 1,675.00
New Fire Hydrant Ext 4 VF 600.00
New 16" x I2" Tee I EA 450.00
New 12" x 6" Tee 1 EA 295.00
New 12' Solid Sleeve 1 EA 250.00
Total Revision to Contract Amount
Previous contract amount
~h
Net increase in contract amount ( ange Ord. #1
Revised contract amount
Net increase m contract time o£completion
Revised Contract time of completion
Total
4,565.00
2,900.00
800.00
1,675.00
2,400.00
450.00
295.00
250.00
$13,335.00
$791,659.50
$13,335.00
$804,994.50
;N/A
The contractor hereb? accepts this Contract adjustment as a final and complete adjustment in Full
accord and satisfaction of all past and fi~ture liability originating under any clause in the Contract by
reason of'this revision to thc Contract.
Recommendlcd by City Engineer Date
Accepted b) Git.,,' Date
Agrecd to by Contractor
r/ate /
J. T. Dersner, Inc.
2101E. Shady Grove
I~ing, Texas 75060
Phone:(972) 421-0930 Fax:(972)421-0934
Mr. Rick O'Dell
City of Coppell
Engineering Dept
255 Parkway Boulevard
Coppell, Texas 75019
Phone: 972-304-7090
December 27, 2005
Ref: Denton Tap 16" Water Line
Sub: Change Order Request #1_'~/
Extra Work at Tine in South of Airline
DESCRIPTION QUANTITY MIS UNIT TOTAL TOTAL
12"PVC Water 100 If $ 45.65 $ 4,56500
12" Gate Valve t~ -~ ,/' ea $ 1,450.00 $ 't~rSe:O0
6" Gate Valve I ea $ 750.00 $ ~
Std Fire Hydrant 1 ea $ 1,500.00 $ ,~ ~-¢~ ~r~
Fire Hydt Extension 4 vf $ 600.00 $ 2,400.00
16"x12" Tee 1 ea $ 450.00 $ 450.00
12'~(6" Tee I ea $ 295.00 $ 295.00
12" Solid Sleeve I ea $ 250.00 $ 250.00
$ -,_~
TOTAL $ 1..1-¢60.00
Replace Defective 12" Gate valve
(if required)
DESCRIPTION QUANTITY I MIS UNIT TOTAL TOTAL
12'' Gate Valve 1 I ea $ 1,450.00 $ 1,45000
$
TOTAL $ 1,450.00
12J29/"2005 I