Loading...
Riverchase (4)-CS051215COPpEL£ December 15, 2005 Ms. Ellen Sullivan 401 Wellington Road Coppell, TX 75019 RE: 401 Wellington Road PRELIMINARY Fee Assessment Letter Dear Ms. Sullivan: Per our telephone conversation yesterday, please find enclosed a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for fees that would be assessed should you decide to install a separate irrigation (sprinkler) meter at the above referenced residence. Also, please find a copy of the permit application that would need to be applied for prior to the installation of the additional meter. The fees would need to be paid by check at the new Public Works Service Center, 816 S. Coppell Road, and the meter would be ordered when those fees were paid. If you have any other questions, please contact me. Sincerely, £ Charlene La Mattina,~E.I.T. Graduate Engineer Phone: (972) 304-3681 DEVELOPMENT FEE TABLE Project: 401 Wellington Road Date: 12/15/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $900.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $25.28 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) lrrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Il Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) tOTAL $1,005.28 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: 401 Wellington Road DATE: 12/15/2005 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 0 ESU's 1 - 5/8 inch X 3/4 inch = 1 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 1 ESU's @ $900.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 irrigation Meter(s) @ $25.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ SQ00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 (Due prior to issuance of building permit) @ $900.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $900.00 $5O.00 $0.00 $25.28 $0.00 $0.00 $0.00 $30.00 $0.00 $0.00 $0.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET Preliminary plat approved: Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $o.oo Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2