Loading...
Amberpoint BP 2R-LR0601128901 Carpenter Frwy,, Suite #100 Dallas, Texas 7~247 (214) 630-1010 Date of Service: 01/12/06 Report No.: Client No.: 93345 Project No.: Client: Coppel] Trade Center LP Project: 5055 Keller Springs Rd Ste 300 Addison, TX 75001 94051190.0185 94051190 Coppell Trade Center - Bldg C NWC Sandy Lake/Freeport Pkwy Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Sheet #2, dated 03/17/05 Locations/Items Observed: Two (2) Temporary Spread Footings along W Building Line at Loading Dock Expansion Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCvMM~:CT ITEMS OBSERVED CoeI.=CT Ir~COMM=c'r Placing DrawP~gs Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type ~ar Grade X Prpeedy Tied X Welded Splices Rebar Clean X Dowel Bars in Ptace X Mechanical Splices Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: P. Labecki Report Distribution: (1) Coppell Trade Center LP (1) TechniStructures (1) City of Coppell TX (1) City of Coppell TX 309pdr (1) Merriman Assoc Inc (1) McFadden & Miller (1) Macatee Engineering Inc Robert D,//~ay, S.E.T. Senior t~6ject Manager This report is exclusively for the use of the client indicated above and shall not pe reproduced without wfitien approval of Terracon. WATER INJECTION OBSERVATION ] fr lcon 8901 Carpenter F m~/., Suite #1 DO Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: Location: 01/12/06 5O854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #6, see attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0065 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Per Rig/3 Rigs On-site Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: 1. The injector, Jowell did not get the 7 feet depth in several locations because the ground was to hard. Field Results Report To: Technician: J. Johnson Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99pdr (1) Rogers O'Brion Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This repeal is exclusively for the use of the client indicated above and shall not be reproduced in full without wri[~en approval of Terracon WATER INJECTION OBSERVATION lrerracon Date of Service: Client No.: Client: 01/12/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0065 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Location: Building #6 Not to Scale 420' 1. Building #6 1/12/06 Pass #4 S Building #5 md shall not be reproduced in full without written approval of Terracon. REPORT OF LIME DEPTH CHECKS 1 rerracon Date of Service: Client No.: Client: Contractor: General Location: Test Method: Comments: 01/12/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Rogers-O'Brien Construction Co. Building Pad #4 NTCOG Report No.: Project No.: Project: 94051418.0066 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX REQUIRED DEPTH ACTUAL DEPTH TEST LOCATION OF LIME OF LIME NO. (in.) (in.) 1 20' S & 20'E of NW comer 6 9 1/2 2 100'S & 100'E of NW comer 6 9 1/4 3 150' S & 60' E of NW comer 6 9 1/2 4 200' S & i00' E of NW comer 6 9 3/4 5 250' S & 200' E of NW comer 6 9 1/2 6 300' S & 300' E of NW comer 6 9 1/4 7 300' S & 100'E of NW comer 6 9 1/2 8 30' S & 100'E of NW comer 6 10 1/8 ..~/~. ~"~ V, , Technician: A. Rendon Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309pdr (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the usc of the cl/ent indicated above and shall not be reproduced in full without written approval of Tercacon. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214-630-1010 Date of Service: 01/12/06 Report No.: Client No.: 50854 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 94051418.0063 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Contractor: Test Location: Rogers-O'Brien Construction Building 4/4 (120' x 560') Approximately 300' S of NW comer Specification Requirements: Minimum Passing 1-3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NTCOG 1-3/4" SIEVE #4 SIEVE TEST LOCATION % PASSING % PASSING NO, 1 Approximately 80' E & 310' S Building Pad #4, NW comer 100 62 2 Approximately 160' E & 390' S Building Pad #4, BTvV comer 100 65 3 Approximately 240' E & 410' S Building Pad #4, NW comer 100 63 4 Approximately 320' E & 410' S Building Pad #4, NW comer 100 60 5 Approximately 400' E & 390' S Building Pad #4, NW comer 100 60 6 Approximately 480' E & 310' S Building Pad 4/4, NW comer 100 64 7 Approximately 560' E & 390' S Building Pad #4, NW comer 100 62 Comments: Technician: D. Drogos Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309pdt (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This repot' is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon