Loading...
Vista Ridge 1R-8 D-CS060123COPi ELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To'- From: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Interim Fire Chief Larry Davis, Construction Inspector ~~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: January 23, 2006 RE: WALK-THRU for Vista Ridge Addition, Lots 1-8/The Plaza A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for Thursday, January 26, 2006 at 2:00 p.m. Please let me know if I can be of further assistance. cc: Gilco Contracting fax 817/735-1613 Rodman Utilities fax 972/712-0971 Neal Heckels fax "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"