Vista Ridge 1R-8 D-CS060123COPi ELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To'-
From:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Interim Fire Chief
Larry Davis, Construction Inspector ~~
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date: January 23, 2006
RE: WALK-THRU for Vista Ridge Addition, Lots 1-8/The Plaza
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for
Thursday, January 26, 2006 at 2:00 p.m.
Please let me know if I can be of further assistance.
cc: Gilco Contracting fax 817/735-1613
Rodman Utilities fax 972/712-0971
Neal Heckels fax
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"