Loading...
Stringfellow 1R-CS060123 (2)cOPFELL January 23, 2006 James Dewey, Jr., P.E. JDJR Engineers and Consultants, Inc. 2500 Texas Drive, Suite 100 Irving, TX 75062 RE: Stringfellow Addition/Lot 1 Block A Construction Plan Review Comments Dear Mr. Dewey: The City of Coppell has reviewed the revised plans for the referenced addition. These plans meet our current minimum standards. Please submit three sets of revised final construction plans for the City Engineer's stamp and as many copies as necessary for your contractors' construction operations. All contractors and subcontractors onsite must have a copy of the plans stamped and approved by the City of Coppell. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This would include dirt work, paving, storm drain, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in public right-of-way, the City of Coppell charges a 4% fee. A check for inspection fees made to City of Coppell should be submitted to this office along with a copy of the contract(s) with the appropriate 2% and 4% calculations shown for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, Charlene La Mattina, E.I.T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-3570