Park West CC(02-2)-LR060118GEOTECHNICAL AND ~ R r'-'l I I ~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
~.~ ParkWest Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 197
REG PROJECT NO. 12468
SAMPLE DATE: 01-11-06
TECHNICIAN: L. Rivera
PAGE: 1 of 1
Location of Sample
Set Number I Location
1 Paving: 10'S, 15'E of SW corner of Bldg. A
Quantity Represented
10/70
Design Information
Source of Concrete I Mix Identification I Specified Stren~lth p.s.i.
TXI 8205 3000
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. I ID Date Tested Test lbs. Stren __n_n_n_n_n_n_n_n,~__ .s.i. Strength p.s.i.
1
7501 01-18-06 7 86700
7501 02-08-06 28
7501 02-08-06 28
7501 Hold H
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. I ID Slump Sample Air Temp. Temp. Entrainment Number
1 7501 5.0 8:35AM 48 57 3.9 185130
Mail
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GRO~TD.
Original Signed By ~ ~
Arthur Etherly, ,11 [/~ /
Manager, CMT ~ IlY
AE/Inc ~/~'
2424 STUTZ DR. · SUITE 400 ,, DALLAS. TX 75235 ,' TeL [214] 350 5600 '" F^X [214] 3500019
F~ EEl--1 I Er~i-~I~EE~I~B
GEOTECHNICALAND ~ ~ ~ I I p
ENVIrONMeNTAl CONSULTANTS
REPOR~'IN FORCING
STEEL P~II~EMENT OBSERVATION
West Commerce Center
,~,,~eltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
REPORT NO. 182
REPORT DATE: 01-18-06
REG PROJECT NO. 12468
DATE OBSERVED: 12-28-05
TECHNICIAN: L. Rivera
PAGE: 1 of 1
CONTRACTOR: Cadence McShane Corporation
[ Items Observed: I Building A northwest ramp.
Reference Plans or Notes Used: I Sheet S3.2
I x Ithere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
Cadence McShane Corporation/
Mr. Bobby Paret
Commerce Construction Co., LP/
Mr. Rick Wyly
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
Northwestern Investment Mgmt./
Mr. Ernest Wi,more
Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/mg
2424STUTZ DR. · SUITE400 · DALLAS, TX75235 ,* T~L [2141350 5600 · F^X [21413500019
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 186
REPORT DATE: 01-18-06
REG PROJECT NO. 12468
DATE OBSERVED: 01-03-06
TECHNICIAN: F. Gomez
PAGE: I of 1
Items Observed: ] S.W. ramp and grade beam: Line C.8 from 22 to 23,
Line E to F from 20.4 and Line E to F from 16 from
Building A.
Reference Plans or Notes Used: I Sheet S3.2 and S1.0
[List Deviations Noted:
il) Missing 1 #7 bar at top both walls in ramp.
2) Missing 4 ~4 bar at top both walls in ramp.
3) Grade beam: Line E to F from 16 missing 2 #7 top and
bottom bars and 2 #5 bars at center of beam.
The noted deviations were reported to: Contractor and Subcontractor
I x IThe noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail Submitted by:
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/rs
2424STUTZ DR. · SUITE400 * DALLAS, TX75235 · T~L [2141350 5600 · F^X [21413500019
GEOTECHNICALAND ~ F~J r-1 I I p
ENVIP, ONHENTAL CONSULTANTS
REPORT OF FIELD DENSITY TESTS
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 188
REPORT DATE: 01-18-06
REG PROJECT NO. 12468
TECHNICIAN: P. Butler
PAGE: 1 of 1
Proctor ASTM
No. Standard Description
D-698
2 D-698
3 D-698
4 D-698
Dark gray and Olive brown clay
Dark brown clay w/calcareous nodules and
trace of gravel
Dark brown clay (lime-treated)
Dark brown clay w/trace limestone
fragments (lime-treated/
Optimum Maximum
Mo sture, % Density, PCF
25.4 91.5
23.9 94.4
22.9 95.0
23.3 95.4
Test
No. Date Location
214 01-04-06 Interior Leave-out: A-17
215 Interior Leave-out: A-14
216 Interior Leave-out: A-9
Depth Field
Below Field
Final S.G. Density Moisture
(feet) (pct') (%)
0.0 86.9 28.6
0.0 87.3 29.0
0.0 87.1 28.2
Proctor Compaction
ID Level (%)
1 95.0
1 95.4
1 95.2
Comments: Where tested, materials were in compliance with project specifications.
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
Cadence McShane Corporation/
Mr. Bobby Paret
Commerce Construction Co., LP/
Mr. Rick Wyly
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
Northwestern Investment Mgmt./
Mr. Ernest Willmore
Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Bill Woolwine
Sr. Manager, CMT