Loading...
Park West CC(02-2)-LR060118GEOTECHNICAL AND ~ R r'-'l I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT ~.~ ParkWest Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 197 REG PROJECT NO. 12468 SAMPLE DATE: 01-11-06 TECHNICIAN: L. Rivera PAGE: 1 of 1 Location of Sample Set Number I Location 1 Paving: 10'S, 15'E of SW corner of Bldg. A Quantity Represented 10/70 Design Information Source of Concrete I Mix Identification I Specified Stren~lth p.s.i. TXI 8205 3000 Test Results Set Cylinder Age @ Total Load Compressive Average No. I ID Date Tested Test lbs. Stren __n_n_n_n_n_n_n_n,~__ .s.i. Strength p.s.i. 1 7501 01-18-06 7 86700 7501 02-08-06 28 7501 02-08-06 28 7501 Hold H Cylinder Data Set Cylinder Time of Concrete Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number 1 7501 5.0 8:35AM 48 57 3.9 185130 Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GRO~TD. Original Signed By ~ ~ Arthur Etherly, ,11 [/~ / Manager, CMT ~ IlY AE/Inc ~/~' 2424 STUTZ DR. · SUITE 400 ,, DALLAS. TX 75235 ,' TeL [214] 350 5600 '" F^X [214] 3500019 F~ EEl--1 I Er~i-~I~EE~I~B GEOTECHNICALAND ~ ~ ~ I I p ENVIrONMeNTAl CONSULTANTS REPOR~'IN FORCING STEEL P~II~EMENT OBSERVATION West Commerce Center ,~,,~eltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret REPORT NO. 182 REPORT DATE: 01-18-06 REG PROJECT NO. 12468 DATE OBSERVED: 12-28-05 TECHNICIAN: L. Rivera PAGE: 1 of 1 CONTRACTOR: Cadence McShane Corporation [ Items Observed: I Building A northwest ramp. Reference Plans or Notes Used: I Sheet S3.2 I x Ithere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) (1) (1) (1) (1) Cadence McShane Corporation/ Mr. Bobby Paret Commerce Construction Co., LP/ Mr. Rick Wyly City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone Northwestern Investment Mgmt./ Mr. Ernest Wi,more Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/mg 2424STUTZ DR. · SUITE400 · DALLAS, TX75235 ,* T~L [2141350 5600 · F^X [21413500019 REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 186 REPORT DATE: 01-18-06 REG PROJECT NO. 12468 DATE OBSERVED: 01-03-06 TECHNICIAN: F. Gomez PAGE: I of 1 Items Observed: ] S.W. ramp and grade beam: Line C.8 from 22 to 23, Line E to F from 20.4 and Line E to F from 16 from Building A. Reference Plans or Notes Used: I Sheet S3.2 and S1.0 [List Deviations Noted: il) Missing 1 #7 bar at top both walls in ramp. 2) Missing 4 ~4 bar at top both walls in ramp. 3) Grade beam: Line E to F from 16 missing 2 #7 top and bottom bars and 2 #5 bars at center of beam. The noted deviations were reported to: Contractor and Subcontractor I x IThe noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Submitted by: Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424STUTZ DR. · SUITE400 * DALLAS, TX75235 · T~L [2141350 5600 · F^X [21413500019 GEOTECHNICALAND ~ F~J r-1 I I p ENVIP, ONHENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 188 REPORT DATE: 01-18-06 REG PROJECT NO. 12468 TECHNICIAN: P. Butler PAGE: 1 of 1 Proctor ASTM No. Standard Description D-698 2 D-698 3 D-698 4 D-698 Dark gray and Olive brown clay Dark brown clay w/calcareous nodules and trace of gravel Dark brown clay (lime-treated) Dark brown clay w/trace limestone fragments (lime-treated/ Optimum Maximum Mo sture, % Density, PCF 25.4 91.5 23.9 94.4 22.9 95.0 23.3 95.4 Test No. Date Location 214 01-04-06 Interior Leave-out: A-17 215 Interior Leave-out: A-14 216 Interior Leave-out: A-9 Depth Field Below Field Final S.G. Density Moisture (feet) (pct') (%) 0.0 86.9 28.6 0.0 87.3 29.0 0.0 87.1 28.2 Proctor Compaction ID Level (%) 1 95.0 1 95.4 1 95.2 Comments: Where tested, materials were in compliance with project specifications. Mail Distribution: (1) (1) (1) (1) (1) (1) Cadence McShane Corporation/ Mr. Bobby Paret Commerce Construction Co., LP/ Mr. Rick Wyly City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone Northwestern Investment Mgmt./ Mr. Ernest Willmore Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr. Manager, CMT BW/rs 24245TUTZ DR. · SUITE400 · DALLAS, TX 75235 * TELl214] 3505600 * ~^X [214] 3500019