Loading...
Northlake 635(13)-CS051229DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Northlake 635 Business Park (Coppell Business Center III, Lot 2R~ Block C~ Replat, to allow thc construction of a 14,545-square-foot office building on 1.51 acres of property located along the west side Lakeshore Drive, approximately 677 feet south of Wrangler Drive, at the request of Rodney $. Hitt, Pachcco Koch Consulting Engineers. STAFF REP.: Matt Steer PROJECT ID# RP-05-0065 DRC DATE: December 29, 2005 and January 5, 2006 CONTACT: Kenneth M. Gri~n, P.E., Dir. o~ Enqineerin~/Public Works 972/304-3686 COMMENT STATUS: */PRELIMINARY F!NAL REV!SED AFTER P&Z Plat 1. A 20' drainage easement should be provided for the drainage structure along the western edge of the property. 2. Provide a 20' easement for the fire hydrant nearest to Lakeshore Drive. Grading and Drainage Plan 1. The surface drainage from drainage area 1 should not sheet flow to the street. Pick up this flow and convey it to the storm drain system on site. Water and Sanitary Sewer Plan 1. Show the fire lane on this sheet. 2. The fire hydrant located in the parking island on the south side of the building is private and should be served after the DDC. (The fire hydrant nearest to Lakeshore Drive is public and should be within an easement.) Landscape Planting Plan, LPI.1 1. Trees should not be planted in the sanitary sewer easement. Ad~tJonai comments may be generated upoo detailed engJtteerJng review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Northlake 635 Business Park (Coppell Business Center III~ Lot 2R~ Block C~ Site Plan, to allow the construction of a 14,54S-square-foot office building on 1.51 acres of property located along the west side Lakeshore Drive, approximately 677 feet south of Wrangler Drive, at the request of Rodney J. Hitt, Pacheco Koch Consulting Engineers. STAFF REP.: Matt Steer PROJECT ID# SPA-05-0064 DRC DA TE: December 29, 2005 and January .5, 2006 CONTACT: Kenneth M. Gri~n, P.E., Dir. o[ En~ineerin~/Public Works 972/304-3686 AFTER P&Z Site Plan 1. Show curve radii for the fire lane. Additional comments may be generated upon detMIed engineering review.