Northlake 635(13)-CS060105DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Northlake 635 Business Park (Copper Business Center III~ Lot 2R~ Block
C~ Replat, to allow the construction of a 14,545-square-foot office building on
1.51 acres of property located along the west side Lakeshore Drive,
approximately 677 feet south of Wrangler Drive, at the request of Rodncy J.
Hitt, Pacheco Koch Consulting Engineers.
STAFF REP.: Matt Steer PROJECT ID# RP-05-0065
DRC DATE: December 29, 2005 and January 5, 2006
CONTACT: Kenneth M. Gri~n, P.E., Dir. of En~ineerin~/Public Works 972/304-3686
COMMENT STATUS: PREL!~.LYARY ,/FINAL RE!~$ED
AFTER P&Z
Grading and Drainage Plan
1. The surface drainage from drainage area 1 should not sheet flow to the street. Pick up
this flow and convey it to the storm drain system on site.
Landscape Planting Plan, LPI.1
1. Trees should not interfere with the sanitary sewer.
AdditlonM comments may be generated upon detailed engineering review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Northlake 635 Business Park (Coppeli Business Center III~ Lot 2R, Block
C~ Site Plan, to allow thc construction of a 14,$45-squar¢-foot office building
on 1.51 acres of property located along thc west side Lakcshore Drive,
approximately 677 feet south of Wrangler Drive, at thc request of Rodney J.
Hitt, Pachcco Koch Consulting Engineers.
STAFF REP.: Matt Steer PROJECT ID# SPA-05-0064
DRC DATE: December 29, 2005 and January 5, 2006
CONTACT: Kenneth ~I. Gri~n, P.E., Dir. o~ En~ine,
COMMENT STATUS: PP~L!MINARY
rrin~/Public Works 972/304-3686
'~ FINAL
No Comments.