Amberpoint BP 2R-LR060118REPORT OF SOIL-LIME MIXTURE PULVERIZATION
'lrerrac:on
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214-630-1010
Date of Service:
Client No.:
Client:
01/18/06
50854
Transwestern Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94051418.0092
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Contractor:
Test Location:
Rogers-O'Brien Construction
Building Pad #4
Specification Requirements:
Minimum Passing 1-3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1-3/4" SIEVE #-4 SIEVE
TEST LOCATION % PASSING % PASSING
NO.
1 400' N & 20' W of SE corner 100 70
2 400' N & 100' W of SE comer 100 72
3 400'N & 200' W of SE comer 100 69
4 400' N & 300' W of SE corner 100 70
5 500'N & 20' W of SE comer 100 71
6 500' N & 100' W of SE corner 100 70
7 500' & 200' W of SE comer 100 69
8 500' N & 300' W of SE corner 100 72
Comments:
Technician: A. Rendon
Report Distribution:
(1) Transwestern Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
309
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is excbmively for the usc of the client indicated above and shall not be reproduced in full without written approval of Terracon.
REPORT OF REINFORCING STEEL OBSERVATION
'll' rf con
Date of Service:
Client No.:
Client:
Services:
Drawings Utilized:
01 / 18/O6
50854
Transwestem Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94051418.0088
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Civil Cl.01, Detail 2150-1, Detail 2150-2
Locations/Items Observed: Pavement, Entrance way to Northpoint Drive
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT iNCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT NCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash & Debns RemOved X Proper Bar Supports X Lapped Splices X
Number of Bars X Proper Cover/Clearance X
DiscrepancieslComments: Any discrepancies found were corrected at the time of this observation unless otherwise
noted.
Field Results Report To:
Technician: D. Drogos
Report Distribution:
(1) Transwestern Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
309acs
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.
REPORT OF SOIL-LIME MIXTURE PULVERIZATION
lrerracon
8901 Carpenter Frwy., Suile #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
01/18/06
50854
Transwestern Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Report No.: 94051418.0103
Project No.: 940514~8.~ ~
Project:~rPoint Bu~
Bmldmgs 4, 5 and 6
505 South Royal Lane
Coppell, TX
Contractor:
Test Location:
Rogers-O'Brien Construction
Building Pad #4
Test Method: NTCOG
Specification Requirements:
Minimum Passing 1-3/4" Sieve: 100°/o
Minimum Passing ~ Sieve: 60%
Sample Condition: Field Moist
1-3/4" SIEVE ~ SIEVE
TEST LOCATION
NO. % PASSING % PASSING
1 20' S & 20' W of NE comer 100 72
2 100' S & 100' W of NE comer 100 73
3 100' S & 200' W of NE comer 100 70
4 100' S & 300' W of NE comer 100 74
5 20' S & 100' W of NE comer 100 72
6 30' S & 200' W of NE comer i00 70
7 30' S & 300' W of NE comer 100 71
Comments:
Technician: A. Rendon
Report Distribution:
(1) Transwestern Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
309as
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for tile use of the cbent indicated above and shall not be reproduced in full without written approval of Terracon,