Loading...
Amberpoint BP 2R-LR060118REPORT OF SOIL-LIME MIXTURE PULVERIZATION 'lrerrac:on 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214-630-1010 Date of Service: Client No.: Client: 01/18/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0092 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Contractor: Test Location: Rogers-O'Brien Construction Building Pad #4 Specification Requirements: Minimum Passing 1-3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist Test Method: NTCOG 1-3/4" SIEVE #-4 SIEVE TEST LOCATION % PASSING % PASSING NO. 1 400' N & 20' W of SE corner 100 70 2 400' N & 100' W of SE comer 100 72 3 400'N & 200' W of SE comer 100 69 4 400' N & 300' W of SE corner 100 70 5 500'N & 20' W of SE comer 100 71 6 500' N & 100' W of SE corner 100 70 7 500' & 200' W of SE comer 100 69 8 500' N & 300' W of SE corner 100 72 Comments: Technician: A. Rendon Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309 (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is excbmively for the usc of the client indicated above and shall not be reproduced in full without written approval of Terracon. REPORT OF REINFORCING STEEL OBSERVATION 'll' rf con Date of Service: Client No.: Client: Services: Drawings Utilized: 01 / 18/O6 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0088 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Civil Cl.01, Detail 2150-1, Detail 2150-2 Locations/Items Observed: Pavement, Entrance way to Northpoint Drive Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT iNCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT NCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debns RemOved X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover/Clearance X DiscrepancieslComments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: D. Drogos Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309acs (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon. REPORT OF SOIL-LIME MIXTURE PULVERIZATION lrerracon 8901 Carpenter Frwy., Suile #100 Dallas, Texas 75247 Date of Service: Client No.: Client: 01/18/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: 94051418.0103 Project No.: 940514~8.~ ~ Project:~rPoint Bu~ Bmldmgs 4, 5 and 6 505 South Royal Lane Coppell, TX Contractor: Test Location: Rogers-O'Brien Construction Building Pad #4 Test Method: NTCOG Specification Requirements: Minimum Passing 1-3/4" Sieve: 100°/o Minimum Passing ~ Sieve: 60% Sample Condition: Field Moist 1-3/4" SIEVE ~ SIEVE TEST LOCATION NO. % PASSING % PASSING 1 20' S & 20' W of NE comer 100 72 2 100' S & 100' W of NE comer 100 73 3 100' S & 200' W of NE comer 100 70 4 100' S & 300' W of NE comer 100 74 5 20' S & 100' W of NE comer 100 72 6 30' S & 200' W of NE comer i00 70 7 30' S & 300' W of NE comer 100 71 Comments: Technician: A. Rendon Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309as (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for tile use of the cbent indicated above and shall not be reproduced in full without written approval of Terracon,