Loading...
ST9905-CS060127 T H E C I T Y 0 F COPPELL January 27, 2006 Mr. Trinidad Aguirre Verizon 2094 McGee Lane Lewisville, TX 75077 RE: Bethel Road ST 99-05 Relocation Plans Dear Mr. Aguirre: As per your request, enclosed please find a set of Bethel Road I plans, and a set of the latest channel improvement drawings. The plans are approximately 90% complete. The channel improvements will be included in the project and incorporated into the final set of plans. At one time we did not think that we were going to construct the channel improvements as part of this project. We have acquired all of the right-of-way required for the roadway improvement. We do not have the drainage easements necessary for the channel construction on the north side of Bethel, but this should not impact your relocations. Should you have any questions or need any additional information, please advise. Sincerely, Suza0 ]'aylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: sta¥1or(~ci.coppell.tx.us