ST9905-CS060127 T H E C I T Y 0 F
COPPELL
January 27, 2006
Mr. Trinidad Aguirre
Verizon
2094 McGee Lane
Lewisville, TX 75077
RE: Bethel Road
ST 99-05
Relocation Plans
Dear Mr. Aguirre:
As per your request, enclosed please find a set of Bethel Road I plans, and a set of the latest
channel improvement drawings. The plans are approximately 90% complete. The channel
improvements will be included in the project and incorporated into the final set of plans. At one
time we did not think that we were going to construct the channel improvements as part of this
project. We have acquired all of the right-of-way required for the roadway improvement. We do
not have the drainage easements necessary for the channel construction on the north side of
Bethel, but this should not impact your relocations.
Should you have any questions or need any additional information, please advise.
Sincerely,
Suza0 ]'aylor
CIP Coordinator
Engineering Department
Direct: 972-304-7019
Fax: 972-304-3570
E-mail: sta¥1or(~ci.coppell.tx.us