Loading...
Amberpoint BP 2R-LR060125WATER INJECTION OBSERVATION 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 6901 Carpenter Fnny.. Sulfe A100 Dallas, Texas ]524] (2141630-1010 Date of Service: 01/25/06 Client No.: 50854 Client: Transwestern Commercial Services Location Procedure: Pass No.: 11~rr~con Consultlnu Enplmers 8 Scientists Report No.: 94051418.0116 Project No.: 94051418 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Building #5, from E end to 350' W General Contractor: Rogers-O'Brien Construction Co. and N side to 70' S Injector: Jowell On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. 7th No. of Probes: Probe Length: 7 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each toad. X Injection pressure 50 to 200 psi at manifold X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: The 7th pass of water injection started along the north side of the building pad at the east end of the pad. Very hard material was encountered at variable depths of 3 feet to 6 feet from the east end to 220 feet f westward and from the north side to 50 feet south. The injection contractor was unable to penetrated this hard material at several locations. NOTE: Injection rigs bent several injection rods throughout the day plus minor mechanical problems contributed to a small area being injected on this date. In the afternoon, the injection contractor was advancing the rods too fast at each 18 inch interval, not allowing refusal of water. The spacing between injections was too far apart in the afternoon. Field Results Report To: Technician: J. Perdue Report Distribution; (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co (1) City of Coppell TX (1) O'Brien & Assoc ~ / (1) City of Coppell TX (1) TechniStructures (~AA'V"/ Hussein H. Abusaad, P.E. Senior Project Manager 99pdr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon. REPORT OF PRECONSTRUCTION MEETING Report Number: 94051418.0097 Service Date: January 18, 2006 lf~rr~con 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 25, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Services: Preconstruction meeting and drilled pier observation. As requested, Terracon's project manager for the above referenced project attended the preconstruction meeting at the offices of Rogers-O'Brien located at 1901 Regal Row in Dallas, Texas. The pier drilling operation and requirements were discussed. Following the meeting, the project manager traveled to the job site and observed the start of the pier drilling operation. After the first two piers were drilled successfully, the project manager left the site. Technician: Hussein H. Abusaad. P.E. Report Distribution (i) Transwestern Commercial Services (1) O'Brien 8 Assoc ~ / (1) City of Coppell TX (i) 7echniStructums Reviewed by: ,'YHAY/`/ (t) Ciry of Coppell 7x Hussein H. Abusaad, P.E. (i) Rogers O'Brien QOnstrOLtlOn Co Senior Project Manager The tests were pertormed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 a>~s~,a9 rM.. k..