CF-Fire Station 3-CS051229DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
~TEM:
Coppell Town Center Addition, Lot 1, Block 1, (Fire Station No. 3) Site
Plan Amendment, to allow a 3,546-square-/hot expansion to the existing Fire
Station located at 133 Parkway Boulevard, at the request of Randall Daniel,
Brinkley Sargent Architects.
STAFF REP.: Matt Steer PROJECT ID# SPR-05-0063
DRC DA TE: December 29, 2005 and January 5, 2006
CONTACT: Kenneth M. Gri~fn, P.E., Dir. o[ En~ineerin~/Public }Forks 972/304-3686
COMMENT STATUS: '/PRELIMINARY FtNAg ~
Utility Plan
1. Water easements should be 20' minimum width.
2. How are easements being dedicated and abandoned?
3. Will the new facility require water and wastewater services? No services are indicated
on the plan.
4. Construction plans should be submitted for review and construction permit should be
applied for through the Engineering Department.
Additional comments may be generated upon detailed engineering review.