Loading...
Freeport NIP(6)-CS060119 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-121, Freeport North, northern portion of Lot 1, Block 1~ (CitiFinancial) P & Z HEARING DATE: C.C. HEARING DATE: January 19, 2006 Febmary 14, 2006 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: 1111 Northpoint Drive (southwest comer of Northpoint Drive and Royal Lane) SIZE OF AREA: 12.28 acres of property CURRENT ZONING: LI (Light Industrial) REQUEST: Zoning change request from LI (Light Industrial) to PD-212-LI (Planned Development-212-Light Industrial), to mnend the approved Site Plan to allow an expansion to the off-street parking areas; to allow deficits in parking and landscaping, and to allow additional site modifications. APPLICANT: HISTORY: Page 1 of 4 Duke Realty Corporation JeffNeal 5495 Beltline Road Suite 360 Dallas, TX 75254 (972) 361-6709 Fax (972) 361-6800 Engineer: Chad Jackson Pacheco Koch Consulting Engineers 8350 N. Central Expressway, # 100 Dallas, TX 75206 (972) 235-3031 Fax (972) 235-9544 This property was developed with a one-story, 125,000-square-foot tilt-wall building in 1998. It is currently occupied by CitiFinancial, a mortgage services center. Item # 6 TRANSPORTATION: Royal Lane is a C4D/6, four-lane divided thoroughfare in a right-of- way containing 110 feet of dedication (adequate for a six-lane divided thoroughfare). Northpoint Drive is a C4D four-lane divided roadway contained within 80-feet of right-of-way. SURROUNDING LAND USE & ZON1NG: North warehouse/distribution facility; LI (Light Industrial) zoning South office/warehouse building; LI (Light Industrial) zoning East - office/warehouse; LI (Light Industrial) zoning West - small, vacant parcel; LI (Light Industrial) zoning COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the properly as suitable for light industrial/showroom uses. DISCUSSION: Page 2 of 4 This request was originally submitted as a Site Plan Amendment to allow for the addition of 35-parking spaces along the western property line to serve the existing tenant of the building, CitiFinancial. However, upon review of the as-built conditions in relation to the Site Plan approved in 1999, major discrepancies became apparent. Also, during this review process, a Building Permit was applied for to allow a relocation of an existing generator and the addition of a patio on the east side of the building, adjacent to Royal Lane. Therefore, it was determined that rezoning was necessary. Existing Conditions As mentioned in the HISTORY section of this report, this building was constructed in 1998. The approved Site and Landscape Plans indicated that 30% of the building was to be used for office and the remaining 70% for warehousing uses. Based on this ratio, 213 parking spaces were required, and 596 parking spaces were originally provided. As indicated on the attached letter dated January 10, 2006, from Jeffrey Neal of Duke Construction, The Associates were the first occupants of this building, employing 600 employees (with 596 parking spaces). However, since that time, additional portions of the building were finished-out for a call center use (from warehousing), increasing the employee count by 185 in 2000 and 300 employees in 2003, for a total of 1,085 employees. There are currently 160 vacant positions in this company. At some point in time, the loading dock area, which was originally designed to serve the warehouse function, was re-striped to accommodate employee parking. Approximately 180 spaces were added; however, the required landscaped areas and trees were not installed. There are currently 780 parking spaces for the existing 925 employees. Item # 6 The purpose of this PD is to allow: · deficits in total number of parking spaces provided; · deficits in landscaping areas and number of trees; · a revision to the Site Plan to add 35 parking spaces, and · the relocation of a generator with screening wall and the addition of a patio area. Deficit in number of parking spaces The Zoning Ordinance requires parking to be provided at a ratio of "one parking space for each employee on the maximum working shift, plus space to accommodate all trucks and other vehicles." Per information provided by the applicant, the maximum number of employees at this facility is projected to be 1,085, thus requiring 1,085 parking spaces. Only 821 spaces are being provided, resulting in a deficit of 264 parking spaces. Staff cannot support this 24% deficit. It is reasonable to assume that the overflow parking will end up on the street, which could potentially cause unsafe conditions. Deficit in landscaping All parking areas are required to have 10% of the area devoted to landscaping, including planting islands with trees, one tree per 400-square feet, etc. The former loading area, which was striped for additional 180 parking spaces, does not meet any landscape requirements. The applicant is requesting a PD condition, which waives all of these requirements. Staff would prefer, as provided for in the Landscape Ordinance, that this parking be legally exempted from the Ordinance as permitted in Section 12-34-8. This provision allows parking lot areas not to be landscaped if they are visually screened with masonry walls at least six-feet high, have limited access, etc. Additional parking along the western property line As mentioned, the original request was simply to add 35 parking spaces along the western property line. This would require the relocation of 12 existing 6- to 8-caliper inch Cedar Elm trees into an existing 10-foot-wide TU Electric easement. Assurances need to be provided from TU that they will permit the planting of trees in their easement. Historically, there has been an issue with over-story trees in this type of easement, and it is assumed that is why they were originally planted 10 feet off of the property line. Page 3 of 4 Replacement of a generator with screening and addition of a patio area The applicant is also requesting additional Site Plan modifications that include the replacement of an existing generator on the south side of the building. It appears from the documents submitted with the Building Item # 6 Permit, that the new generator will be screened with an approximate 12'- tall screening wall. Elevations of this wall, with materials and colors, etc., need to be included in this PD Site Plan, with assurances that the new wall will match the existing structure. Also being requested is a new patio area at the southeast corner of the building. There are no structures being proposed; however, this will necessitate the relocation of an existing tree. Where this tree will be relocated needs to be specified. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending: 1) APPROVAL of the parking spaces in the former loading area, subject to the area being brought into compliance with either Section 12-34- 8(A) (areas exempt from landscaping) or provision of the required landscaping. 2) APPROVAL of the provision of the 35 parking spaces along the western property line, subject to confirmation from TU Electric Delivery Company, allowing for the relocation of the 12 Cedar Elm trees into their easement. 3) APPROVAL of the relocation of the generator, subject to the submission of elevations of the screening wall and assurance that the wall will match the existing building. 4) APPROVAL of the patio area, subject to specification of the location of the relocated tree. 5) DENIAL of the variance to the parking requirements, to allow a 264- parking space deficit. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1 ) Detail Site Plan 2) Landscape Plan Item# 6 Page 4 of 4 D' 'ke CONSTRUCTION January 10, 2006 Ms Marcie Diamond City of Coppell 255 Palkway Boulevard Richardson, Texas 75080 Freeport IV Parking Expansion ('oppell, Texas Ms Diamond: Duke Construction has spoken to Lawrence Fears with CitiFinancial regarding previous tenant finish outs to Duke's Freeport IV building in Coppell. Texas. Below is a summary of all tenant finish proJeCtS perlbrmed at this property by The Associates or CitiFinancial. Also, Duke Construction has included a copy of construction drawings [br the first 3 projects below. Neither Duke Construction nor CitiFinancial were able to locate construction drawings for the CitiFinancial project below. Year Approximate # Project SF of Project Completed of Employees The Associates 74,367 SF 1999 600 employees The Associates - 9,400 SF 2000 150 employees AMU Expansion The Associates - 10.400 SF 2000 35 employees Equiptrans/Selectruck CitiFinancial 32,458 SF 2003 300 employees 4 Projects 126,625 SF 1,085 employees Currently, CitiFinancial has an employee vacancy of approximately 160 employees providing Ibr a cun-ent employee count of 925. Please review and let me know if you have any questions or require further inIbrmation. Please do not hesitate to contact me at 972-361 6709. Sincerely, Project Manager CC: Jeff' Fumer, Dake Realty Corporation Jeff Thornton, Duke Realty Corporation Chad Jackson, Pacheco Koch File