Loading...
TexasBank 2R-CS060130COFFELL January 30, 2006 Chris Ripke Workman Construction Fax: 817/635-2705 RE: TexasBank Addition, Lot 2R Block A (Crgme de la Cr~me) SITE CLEAN-UP, Second Notice Dear Mr. Ripke: There has been no action taken as the result of the letter faxed to you dated January 19th regarding the gravel access across the lot south of Cr~me de la Cr~me. I reiterate that clean-up of this area is your responsibility and was noted during the pre-construction conference process. Please arrange for removal of the gravel and any related materials by the end of this week (February 3ra). If the clean-up is not accomplished, the City of Coppell will use the maintenance bond in effect for this project. If you have any questions, feel free to contact me at (972) 304-7090. Sincerely, Rick O'Dell, Construction Inspector Office Phone: 972-304-7090 Fax: 972-304-3570 CC: Keith R. Marvin, P.E., Asst. City Engineer Glenn Hollowell, P.E., Asst. Director of Public Works 255 PARKWAY ~ p O.BOX 9478 ~ COPPELL TX 75019 ~r TEL 972/462 0022 ~ FAX 972/304 3673