Loading...
Wynnpage N 2&3-CS060130 (2)T H E C I T Y O F COl'FELL January 30, 2006 Mr. Marc O. Bentley, P.E. Bentley Engineering, Inc. 4125 Broadway Blvd., Suite A250 Garland, TX 75043 RE: Wynnpage Plaza, Lots 2 & 3, Block B Fee Assessment Letter Dear Mr. Bentley: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $23,341.50 and tbrward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for xvater and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of lhis project. We look Ibrward to working with you on this project. If you have an5' questions, please contact me. Sincerely, Charlene La Mattireh, E.I.T. Graduate Engineer cc~ Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE TABLE Project: W),nnpage Plaza, Lots' 2 & 3, Block B Date: 1/26/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $3,080.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $408.68 (100% due at Issuance of Water Meter) Water Meter Fee (lrrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewatcr Impact Fee $3,080.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at lssuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $23,341.50 $23,341.50 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee [ntbrmation not Available (100% due prior to Start of'Construction) I'OTAL $30,270.18 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $23,341.50 DEVELOPMENT FEE WORKSHEET PROJECT: Wynnpage Plaza, Lots 2 & 3, Block B DATE: 1/26/2006 Water Impact Fee: Domestic Meter(s): 2 - 2 inch Credit for Abandonment of Existing meter(s): 2 - 1 inch Irrigation Meter(s): 0 Fireline Meter(s): 0 Total #: 11 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $204.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% 0ue prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 11 (Due prior to issuance of building permit) $28000 ea. Wastewater Tap Inspection Fee: Total fl: 2 Connections @ $50.00 ea, (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $5000 ea. (100% due prior to issuance of building permit) 16 ESU's -5 ESU's 0 ESU's 0 ESU's $3,080.00 $100.00 $408.68 $0.00 $0.00 $0.00 $60.00 $o,oo $3,080.00 $100.00 $100.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $23,341.5O Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Wynnpage Plaza, Lots 2 & 3, Block B 1/26/2006 ROADWAY IMPACT FEE: Service Area * 1 Category ** Office Land Use ** General Office Blds. Building Area (sf) 19,500 Development Units ** 19.50 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due: (Development Units) x (Veh c e Mi es per Development Unit) x (Fee per Vehicle Mile) = $23,341.50 * (Figure 2 - Roadway hnpact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) I ~MOUNrDuE: $232,4!;S0I