Loading...
DR0501-CS060131H E C I T Y 0 F COFFELL January 31,2006 Mr. Gary Dry Lawrence Engineering 12500 Schroeder, Suite B Dallas, Texas 75243 RE: Wagon Wheel Park Outfalt Structure DR 05-01 Construction MateriaIs Testing Dear Mr. Dry: Enclosed please find a set of construction plans and specifications for the above referenced project. The project consists of the removal of failed headwall structure and pipe segments and the construction of a new junction box structure and headwall structure on piers, and the installation of 42-inch IlDPE pipe. The project is advertising and bids will be opened on February 14, 2006. Please submit a proposal with an estimate of the type and number of construction materials tests required for the project based on the plans and specifications, and the city's standards. Section 5, Description of Pay Items, in the specifications provides detail on the scope of the work involved in each pay item. Standard construction details can be found on the city's website (www.ci.coppell.tx.us). The contractor is responsible for payment of materials testing done before 8:00 a.m. and after 5:00 p.m., and for any re-testing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suzan'~l Taylor ~ C.I.P. Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: 8to~lor~gi.co~pcll.tx.u s Attachments