WA0101-CS060130COPPELL January 30, 2006 Luis Velasquez Fox Contractors, Inc. PO Box 951 Midlothian TX 76065 RE: Project #WA 01-01 SH 121 Waterline Project, Coppell Rd to Denton Tap Final Acceptance Dear Mr. Velasquez: The improvements in the above referenced project were inspected during construction by the City of Coppell Engineering Department and were installed according to plans and our specifications governing such work. The erosion control should be removed from the project limits upon receipt of this letter. As of today's date, the facilities are accepted subject to the two-year maintenance agreement. Thank you for your cooperation during this construction, and if I can be of further service, please contact me at (972) 304-3684. Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 Keith R. Marvin, P.E. Assistant City Engineer CCi Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of PuNic Works Tim Oates, Interim Fire Chief