Loading...
Clark Estates-CS060111COPPELL January 11, 2006 Patrick anti Mary (;lark 828 Delbrest Road Coppell, TX 75019 RE: Clark Estates, Lot 1, Block 1 Fee Assessment Letter Dear Mr. and Mrs. Clark, Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Park Impact Fees to the City of Coppcll in the amount of $1,=8_.00 and forv, md to thc Eogineermg Department akmg with a copy of the Fee ?,ssessment table. This amount is the porlion of the assessed I;ees that needs to bc paid prior to filing of the final plat. A credit ['or the dedication of right of way along l)cforest Road has been used to offset thc Roadway Impact Fees. Since there are no plans to change any of thc utilities, there arc no ut ty impact fees due. If an additional irrigation meter is installed with this project, that ,alii constitute an impact to the system, and appropriate lees would need to be paid. Appropriate payment of the required lk'es ,,',.ill help insure a successful beginning of this project. We look lbrward to v,'orking with you on this pro.}ect. If you have any questions, please contact mc. gmccrcl,,. Charlene La Mattina, bL.I.T. Graduate Engineer CC: Jennifer Armstrong, Finance Director Mary Beth Spletzer. Administrative Secretary. Building Inspections Glenn ltollowell. Assistant Directur of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE WORKSHEET PROJECT: Clark Estates, Lot 1, Block 1 (828 Deforest Rd.) DATE: l/11/2006 Water lmpact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): Total #: 0 ESU's @ $900.00 ea (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $000 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $000 Total #: 0 Additional Irrigation Meter(s) @ $0 00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30 00 ea (100% due prior to issuance of water meters) Wastewater lmpact Fee: Total Domestic Meters ESU's: 0 (Due prior to issuance of building permit) @ $90000 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea (100% due prier to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) 0 ESU's 0 ESU's 0 ESU's 0 ESU's $0.00 $0.00 $0.00 $0.00 $0.00 $o.oo $o.oo $0.00 $0.00 $000 $0.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET Preliminary plat approved: After October 26, 1993 Park Development Zone: 1 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285,00 per unit (100% paid prior to Council approval of final plat) Zone 2 $1,285.00 $0.00 $0.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Clark Estates, Lot I, Block I (828 Deforest Rd.) 1/I 1/2006 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential ~and Use ** Residential (Medium/Low) No. Lots/Units 1 Development Units ** 1.00 Vehicle Miles per Development Unit ** 4.24 Fee per Vehicle Mile *** $150 Roadway Impact Fee due (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $636.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4. l0 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) Credit for Right of Way Dedication $636 $636.00