Loading...
Amberpoint BP 2R-LR060126· WATER INJECTION OBSERVATION "l rfacon ConsuItlnfl Engineers & Scientists 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: Location: 01/26/06 50854 Trans~vestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #5, see attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0119 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 7th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X lnjection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Four (4) injection rigs were used on this date except one (1) injection rig was out of service in the afternoon. The east end of the pad for Building #5 was injected on this date. The weather was cloudy, cool and a threat of rain. Field Results Report To: Jeff w/Rogers-O'Brien Construction Co. Technician: L. Ratcliff Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99 (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon 8901 Carpenter Frwy, Suile #100 Date of Service: 01/26/06 Report No.: Client No.: 50854 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd Sro 600 W Dallas, TX 75244 94051418.0119 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Building #5 Previously injected .~"~~~ 720' ~ 170' Building #6 < 420' Remaining portion to be injected. Not to Scale N S FIELD DENSITY TESTING Report Number: 94051418.0100 Service Date: January 20, 2006 'lrefracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Material Laboratory No. Test Method Description and Classification Lab Test Data Project Requirements Optimum Max, Lab Water Dry Unit Water Minimum Dry Content Weight Content Unit Weight (%) (pc0 (%) (% compaction) 1 514180001 ASTM D 698 Brown clay w/sand 2 514180001 ASTM D 698 Brown clay w/sand Field Test Data Test No. Test Location 19.0 101.2 -1/+3 95 19.0 101.2 -2/+2 95 Probe Water Dry Unit Dry Unit Lift/ Mat. Depth Content Weight Weight Elev. No. (inches) (%) (pcf) (% compaction) Sanitary Sewer, Line S 463 Sta. 12+50 5' BFG 1 6 20.4 99.8 99 464 Sra. 12+50 4' BFG 1 6 20.0 100.4 99 465 Sra. 12+50 3' BFG 1 6 19.8 100.6 99 466 Sta. 12+50 2' BFG 1 6 19.9 100.3 99 467 Sra. 12+50 1' BFG 1 6 20.1 100.0 99 468 Sta. 12+50 Final 1 6 19.7 100.9 100 469 Sta. 7+00 6' BFG 1 6 20.6 99.7 99 470 Sra. 7+00 5' BFG 1 6 20.3 99.6 98 471 Sra. 7+00 4' BFG 1 6 19.9 100.3 99 472 Sra. 7+00 3' BFG 1 6 20.1 99.9 99 473 Sta. 7+00 2' BFG 1 6 20.4 99.6 98 474 Sta. 7+00 1' BFG 1 6 20.7 99.8 99 475 Sta. 7+00 Final I 6 19.9 99.4 98 Water Line 476 40' N & 20' E of SE corner of Building ¢f4 3' BFG 2 6 19.1 99.8 99 477 40' N & 20' E of SE corner of Building ~If-4 2'BFG 2 6 19.4 99.6 98 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of 2 FIELD DENSITY TESTING 'lFerracon Client:Transwestem Commercial Services Project Number:94051418 Report Number: 94051418.0100 Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elev. No. (inches) 478 40' N & 20' E of SE corner of Building 1f-4 1' BFG 2 6 479 40' N & 20' E of SE corner of Building #4 Final 2 6 480 100' N & 20' E of SE corner of Building #4 2'BFG 2 6 461 100' N & 20' E of SE comer of Building #4 I'BFG 2 6 482 100' N & 20' E of SE corner of Building #4 Final 2 6 Water Dry Unit Dry Unit Content Weight Weight (%) (pct') (% compaction) 19.0 100.1 99 19.3 99.9 99 19.9 99.2 98 19.6 99.9 99 20.0 100.5 99 Datum: BFG = below final grade Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method~STM D-2922, ASTM D3017 Technician: Armando Rendon Field Results Reported To: Superintendent Report Distribution: ~ (1) Transwestern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: ( 1 ) City of Coppell TX (1) Rogers O*Brien Construction Co Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repott is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. FIELD DENSITY TESTING 'Report Number: 94051418.0083 Service Date: January 17, 2006 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Material Laboratory No. Test Method Description and Classification Lab Test Data Proiect Requirements Optimum Max. Lab Water Dry Unit Water Minimum Dry Content Weight Content Unit Weight (%) (pcf) (%) (% compaction) 1 514180001 ASTM D 698 Brown clay w/sand 2 514180069 ASTM D 698 Brown and gray clay w/sand (lime treated) 3 514180003 ASTM D 698 Reddish brown sandy clay Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elev. No. (inches) 19.0 101.2 -2/+2 95 24.3 97.7 -2/+2 95 14.8 112.3 -2/+2 95 Water Dry Unit Dry Unit Content Weight Weight (%) (pcf) (% compaction) Building Pad #4 408 20' N & 20' W of SE corner Final 2 6 25.8 94.1 96 409 100' N & 100' W of SE corner Final 2 6 25.3 94.7 97 410 300' N & 300' W of SE corner Final 2 6 24.9 95.2 97 411 20' N & 300' W of SE corner Final 2 6 25.3 94.4 97 412 100' N & 20' W of SE corner Final 2 6 25.6 94.8 97 413 200' N & 200' W of SE corner Final 2 6 25.0 94.9 97 Water Line, Line B 414 Sta. 30+50 2' BFG 3 6 15.7 111.6 99 415 Sta. 30+50 I'BFG 3 6 16.1 112.2 100 416 Sta. 30+50 Final 3 6 15.9 112.8 100 417 Sta. 27+50 2' BFG 1 6 19.4 99.8 99 418 Sta. 27+50 1' BFG 1 6 19.9 99.4 98 419 Sta. 27+50 Final 1 6 20.0 98.6 97 420 Sta. 23+00 2' BFG 1 6 19.2 98.3 97 421 Sta. 23+00 1' BFG 1 6 19.5 98.2 97 The tests were performed in general accordance with applicable ASTM. AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location{s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. . FIELD DENSITY TESTING lrerracon Client:Transwestem Commercial Services Project Number:94051418 Report Number: 94051418.0083 Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elev. No. (inches) 422 Sta. 23+00 Final 1 6 423 Sra. 20+50 2' BFG 1 6 424 Sta. 20+50 1' BFG 1 6 425 Sra. 20+50 Final 1 6 Pavement, Fire Lane 426 50' S & 30' W of SE corner of Building ~4 Final 1 6 427 50' S & 100' W of SE corner of Building ~4 Final 1 6 428 50' S & 200' W of SE corner of Building #4 Final 1 6 429 50' S & 300' W of SE corner of Building ~-4 Final 1 6 430 50' S & 500' W of SE corner of Building ~ Final 1 6 431 50' S & 700' W of SE corner of Building #4 Final 1 6 432 50' S & 100' E of SW corner of Building #4 Final 1 6 Water Dry Unit Dry Unit Content Weight Weight (%) (pcf) (% compaction) 19.6 98.0 97 19.8 99.1 98 19.4 98.7 98 19.6 98.3 97 20.0 100.8 100 18.7 101.0 100 19.5 101.4 100 18.9 100.9 100 18.7 101.7 100 20.4 101.1 100 20.1 101.8 100+ Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method:ASTM D2922, ASTM D3017 Technician: Armando Rendon Field Results Reported To: Superintendent Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Assoc ~{.-T~ j (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX (1) Rogers O'Brien Construction Co Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repod is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. FIELD DENSITY TESTING Report Number: 940514'18.0096 Service Date: January 19, 2006 'il'erracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Material Laboratory No. Test Method Description and Classification Lab Test Data Project Requirements Optimum Max. Lab Water Dry Unit Water Minimum Dry Content Weight Content Unit Weight (%) (pCf) (%) (% compaction) 1 514180069 ASTM D 698 Brown and gray clay w/sand (lime treated) Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elev. No. (inches) Building Pad #4 24.3 97.7 -2/+2 95 Water Dry Unit Dry Unit Content Weight Weight (%) (pc0 (% compaction) 443 20' N & 20' W of SE corner Final 1 6 25.6 95.1 97 444 100' N & 100' W of SE corner Final 1 6 25.9 94.8 97 445 200' N & 200' W of SE corner Final 1 6 25.4 94.6 97 446 200' N & 300' W of SE corner Final 1 6 25.9 94.2 96 447 20' N & 100' W of SE corner Final 1 6 25.7 94.4 97 448 100' N & 300' W of SE comer Final 1 6 26.0 94.1 96 449 20' N & 300' W of SE corner Final 1 6 25.5 94.8 97 450 300' N & 20' W of SE corner Final I 6 26.0 95.8 98 451 400' N & 30' W of SE corner Final 1 6 25.8 96.2 98 452 500' N & 30' W of SE corner Final 1 6 25.7 96.0 98 453 600' N & 30' W of SE corner Final 1 6 26.2 95.7 98 454 300' N & 300' W of SE corner Final 1 6 25.4 95.4 98 455 400' N & 300' W of SE corner Final 1 6 25.9 96.1 98 456 500' N & 300' W of SE corner Final 1 6 26.2 95.8 98 457 300' N & 200' W of SE corner Final 1 6 24.8 95.2 97 458 400' N & 200' W of SE corner Final 1 6 24.7 95.4 98 459 500' N & 200' W of SE corner Final 1 6 25.0 94.7 97 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(a) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials, Page 1 of 2 FIELD DENSITY TESTING 3rEffacon Client:Transwestem CommerciaJ Services Project Number:94051418 Report Number: 94051418.0096 Field Test Data Probe Water Dry Unit Dry Unit Test Lift/ Mat. Depth Content Weight Weight No. Test Location Elev. No. (inches) (%) (pcf) (% compaction) 460 300' N & 100' W of SE corner Final 1 6 25.2 94.3 97 461 400' N & 100' W of SE corner Final 1 6 24.9 95.3 98 462 500' N & 100' W of SE corner Final 1 6 25.6 95.5 98 Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method:ASTM D2922, ASTM D3017 Technician: Armando Rendon Field Results Reported To: Superintendent Report Distribution: (1) Transweslern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of CoppeJl TX (1) Rogers O'Brien Construction Co Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. FIELD DENSITY TESTING Report Number: 94051418.0091 Service Date: January 18, 2006 'lrefraron 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Lab Test Data Proiect Requirements Optimum Max. Lab Water Dry Unit Water Minimum Dry Material Laboratory Content Weight Content Unit Weight No. Test Method Description and Classification (%) (pcf) (%) (% compaction) 1 514180001 ASTM D 698 Brown clay w/sand 19.0 101.2 -2/+2 95 2 514180003 ASTM D 698 Reddish brown sandy clay 14.8 112.3 -2/+2 95 Field Test Data Probe Water Dry Unit Dry Unit Test Lift/ Mat. Depth Content Weight Weight No. Test Location Elev. No. (inches) (%) (pCl~ (% compaction) Storm Sewer, Line A 433 Sta. 13+50 4' BFG 2 6 14.3 108.5 97 434 Sta. 13+50 3' BFG 2 6 14.8 109.1 97 435 Sta. 13+50 2' BFG 2 6 15.0 108.8 97 436 Sra. 13+50 1' BFG 2 6 14.9 108.7 97 437 Sra. 13+50 Final 2 6 14.7 108.5 97 438 Sra. 16+50 4' BFG 2 6 13.9 109.3 97 439 Sta. 16+50 3' BFG 2 6 14.2 109.0 97 440 Sta. 16+50 2' BFG 2 6 13.7 109.5 98 441 Sta. 16+50 1' BFG 2 6 13.6 109.8 98 442 Sra. 16+50 Final 2 6 14.1 109.2 97 Datum: BFG = below final grade Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method~,STM D2922, ASTM D3017 Technician: Armando Rendon Field Results Reported To: Superintendent Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Assoc (~ (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) city of Coppell TX (1) Rogers O'Brien Construction Co Hussein H. Abusaad, P.E. Senior Project Manager The testa were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shaJl not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0087 Service Date: January 18, 2006 'JrErracon 8901 Carpenter Fro,y, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3000 psi (~ 28 Days Batch Time: 4:18pm Plant: 2 Supplier: Potter Concrete Truck No: 103 Ticket No: 10269 Mix I.D. No.: 9337 Field Test Data Test Result Slump, inches: 4.00 Air Content, %: Concrete Temperature,o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data 69 60 Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 I 2 6.00 28.27 1 3 1 4 Sample Information Date Cast: January 18, 2006 Time:4:43pm Technician: Terry Smith InspFFesting Weather Conditions: Accumulative Yards: 90 Placement Method: Direct Discharge Sampre Locations: C/3 & C/4 Placement Location: Piers, Building Specification Test Method 5-7 ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 01/25/2006 7 116,450 4,120 01/25/2006 7 114,780 4,060 Average 4,090 02/15/2006 28 02/I 5/2006 26 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Terry Smith Insp/Testing Report Distribution: (1) Transw~stern Commerciar Services (1) O'Brien & Assoc (1) City of Coppel[ TX (1) TechniStructures Reviewed by: (1) City of Coppell TX Husseln H. Abusaad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0093 Service Date: January 18, 2006 'lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4000 psi ~ 28 Days Batch Time: 3:21pm Plant: 3 Supplier: Lattimore Truck No: 5005 Ticket No: 3207653 Mix I.D. No.: 1851 WaterAdded Onsite Before Test: 0Gallons Water Added Onsite After Test: 5 Gallons Field Test Data Test Result Slump, inches: 4.00 Air Content, %: 2.0 Concrete Temperature,o F: 81 Ambient Temperature, o F: 75 Plastic Unit Weight, pcf: Laboratory Test Data Set specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 3 4 Sample Information Date Cast: January 18, 2006 Technician: Ira S. Haynes Weather Conditionsz31ear Time:4:20pm Placement Method: Direct Discharge Sample Locations: Sta. 12+65.64 Placement Location: Manhole of Line H, Storm Drain Specification Age at Date Test Tested (days) 01/25/2006 7 01/25/2006 7 Average 02/15/2006 28 02/15/2006 28 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM Cl 064 ASTM C138 Maximum Compressive Load Strength (lbs) (psi) 126,710 4,480 127,350 4,500 4,490 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Ira S. Haynes Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Asso¢ (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX /H'ussein H. Abusaad, (~) Rogers o'erien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propetties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0089 Service Date: January 18, 2006 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: January 26, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 7:52am Plant: On-site Supplier: Potter Concrete Truck No: 126 Ticket No: 10250 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 4.75 Air Content, %: 5.1 Concrete Temperature,o F: 65 Ambient Temperature, o F: 35 Plastic Unit Weight, pcf: 145.4 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 Sample Information Date Cast: January 18, 2006 Time:8:16am Technician: Daniel J. Drogos Weather ConditionsSunny and cool Accumulative Yards:60 Placement Method: Direct Discharge Sample Locations: See attached sketch Placement Location: Pavement, Entrance way to Northpoint Drive Specification 3-5 3-6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) '01/25/2006 7 114,340 4,040 1 2 02/15/2006 28 1 3 02/15/2006 28 1 4 03/15/2006 56 Services - Obtain samples of fresh concrete at the placement locations, pedorm required field tests and cast compressive strength samples. Technician: Daniel J. Drogos Report Distribution: (1) Transw~stern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX Hu~sein H. Abusaad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. · EXIS SIGN '1 L x I~" I-I, ~ SCREEI~ WALL ~,' 5~. TRANSF'C't~"IE R _ _ _ _5~_EL LJ Cz~T _P _OL_~ .... P_ _A~,_ _P-~-F_. Z~_ _ - ~;H~ ~ - -4~-~. -~.I-I: ............................... 24' WIDE FIRE LANE 70' L x 12' I-L r WALL ,A2.204 I L X 12' H. SCREEN WALL 24' WIDE FIRE LANE -O]TF TFBqTFFIT FFflTFFOT