Amberpoint BP 2R-LR060201WATER INJECTION OBSERVATION
'lrerracan
8901 Carpenter Frwy, Suite #100
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
Location:
02/01/06
50854
Transwestern Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Building #6, see attached sketch
Report No.:
Project No.:
Project:
General Contractor:
Injector:
94051418.0146
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Rogers-O'Brien
Jowell
Procedure:
On this date, a Terracon technician observed the injection of water at this site. During the
injection process, the following observations were recorded.
Pass No.: 6th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Field Results Report To:
Technician: B. Thomas
Report Distribution:
(1) Transwestern Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
99as
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein, H. Abusaad, P.E.
Senior Project Manager
This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.
· WATER INJECTION OBSERVATION SKETCH
'lrerracon
8901 Carpenter Frwy, Suite #100
DallaSr Texas 75247
(214) 630-1010
Date of Service:
Client No.:
Client:
02/01/06
50854
Transwestem Commercial Services
500I Spring Valley Rd Ste 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94051418.0146
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Not to Scale
W
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94051418.0111
Service Date: January 24, 2006
'lrerracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client:
Transwestern Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Report Date: February 01,2006
Project: AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Project No.: 94051418
Material Information
Specified Strength: 3000 psi ~ 28 Days
Batch Time: 10:50am Plant: 2
Supplier: Potter Concrete
Truck No: 122 Ticket No: 102336
Mix I.D. No.: 9337
Field Test Data
Test
Result
Slump, inches: 6.00
Air Content, %: 0.8
Concrete Temperature,o F: 65
Ambient Temperature, o F: 69
Plastic Unit Weight, pcf: 148.7
Laboratorv Test Data
set specimen Diameter Area
No. ID (inches) (sq. inches)
1 1 6.00 28.27
Sample Information
Date Cast: January 24, 2006
Technician: Daniel J. Drogos
Weather ConditionsSunny
Accumulative Yards:60
Placement Method: Direct Discharge
Sample Locations: Pier B/19
Placement Location: Piers
Time: 11:08am
Specification
5-7
Test Method
ASTM C143
ASTM C231
ASTM Cl 064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Date Test Load Strength
Tested (days) (lbs) (psi)
01/31/2006 7 68,850 2,430
1 2 02/21/2006 28
1 3 02/21/2006 28
1 4
03/21/2006 56
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94051418.0111
Service Date: January 24, 2006
'lrerracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client:
Transwestern Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Report Date: February 01,2006
Project: AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Project No.: 94051418
Material Information
Specified Strength: 3000 psi @ 28 Days
Batch Time: 1:44pm Plant: 2
Supplier: Potter Concrete
Truck No: 122 Ticket No: 102349
Mix I.D. No.: 9337
Field Test Data
Test
Result
Slump, inches: 6.00
Air Content, %: 0.9
Concrete Temperature, o F: 66
Ambient Temperature, o F: 67
Plastic Unit Weight, pcf: 150.1
Laboratory Test Data
Set Specimen Diameter Area
No. ID (inches) (sq. inches)
2 1 6.00 28.27
Sample Information
Date Cast: January 24, 2006
Technician: Daniel J. Drogos
Weather ConditionsSunny
Accumulative Yards: 190
Placement Method: Direct Discharge
Sample Locations: Pier E/15
Placement Location: Piers
Specification Test Method
5-7 ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Date Test Load Strength
Tested ldays) (lbs) (psi)
Time: 1:52pm
01/31/2006 7 83,380 2,950
2 2 02/21/2006 28
2 3 02/21/2006 28
2 4 03/21/2006 56
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Daniel J. Drogos
Report Distribution: ~
(1) Transwestern Commercial Services (1) O*Brien & Assoc
(1) City of Coppell TX (1) TechniStructures Reviewed by:
(1) City of CoppeII TX Hussein H. Abusaad, P.E.
(1) Rogers O'Brien Construction Co Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AAS HTO, or DOT test methods, This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
FIELD DENSITY TESTING 'lrerracon
Report Number: 94051418.0117 89ol Carpenter Frwy, Ste #100
Service Date: January 25, 2006 Dallas, Texas 75247
(214) 830-1010
Client: Report Date:~
Project: ~, AmberPomt ~uslnes.~ ~r~
Transwestern Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Project No.:
~dings4, 5 and 6
505 South Royal Lane
Coppell, TX
94051418
Material Information
Material Laboratory
No. Test Method
Description and Classification
Lab Test Data
Optimum Max. Lab
Water Dry Unit
Content Weight
(%) (pc0
Project Requirements,
Water Minimum Dry
Conter~t Unit Weight
(%) (% compaction)
1 514180001 ASTM D 698 Brown clay w/sand
Field Test Data Probe
Test Lift/ Mat. Depth
No. Test Location Elev. No. (inches)
Water Line
483 300' N & 20' E of SE corner of Building #4 3' BFG 1 6
484 300' N & 20' E of SE corner of Building ¢f-4 2' BFG 1 6
485 300' N & 20' E of SE corner of Building #4 1' BFG 1 6
486 300' N & 20' E of SE corner of Building #4 Final 1 6
19.0
101.2 -2/+2 95
Water Dry Unit Dry Unit
Content Weight Weight
(%) (pc0 (% compaction)
20.4 100.6 99
19.9 101.1 100
20.2 100.5 99
20.0 100.8 100
Datum: BFG = below final grade
Comments:
Test results on this report meet project specification.
Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture
condition.
Field Test Method:ASTM D2922, ASTM D3017
Technician: Armando Rendon
Field Results Reported To: Sup
Report Distribution:
Transwestern Commercial Services ssoc
(1) City of Coppell TX uctures
(1) City of Coppell TX
(1) Rogers O'Brien Construction Co
in general acc
;produceN~
Reviewed by: ~
Hussein H. Abusaad, P.E.
Senior Project Manager
The tests were performed pplicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be rE ~xcept in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
FIELD DENSITY TESTING
Report Number: 94051418.0124
Service Date: January 26, 2006
Client:
Transwestern Commercial Services
^ttn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Report Date: February 01,2006
Project:
Project No.:
'lrerracan
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
94051418
Material Information
Material Laboratory
No. Test Method
Description and Classification
Lab Test Data
Optimum Max. Lab
Water Dry Unit
Content Weight
(%) (pcf)
Proiect Requiremeh[~
Water Minimum Dry
Content Unit Weight
(%) (% compaction)
1 514180001 ASTM D 698 Brown clay w/sand
Field Test Data Probe
Test Lift/ Mat. Depth
No. Test Location Elev. No. (inches)
Water Line
487 200' S & 20' E of NE corner of Building #4 3' BFG 1 6
488 200' S & 20' E of NE corner of Building #4 2' BFG 1 6
489 200' S & 20' E of NE corner of Building ~ 1' BFG 1 6
490 200' S & 20' E of NE corner of Building ~N- Final 1 6
19.0 101.2 -2/+2 95
Water Dry Unit Dry Unit
Content Weight Weight
(%) (pc0 (% compaction)
19.6 101.0 100
19.9 100.7 100
20.1 100.3 99
19.8 100.9 100
Datum: BFG = below final grade
Comments:
Test results on this report meet project specification.
Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture
condition.
Field Test Method~,STM D2922, ASTM D3017
Technician: Armando Rendon
Field Results Reported To: Superintendent
Repod Distribution: ~
(1) Transwestern Commercial Services (1) O'Brien & Assoc
(1) City of Coppell TX (1) TechniStructures Reviewed by:
(1) Cily of Coppell TX Hussein H. Abusaad, P.E.
(1) Rogers O'Brien Construction Co Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AAS HTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent ef our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
CONCRETE COMPRESSIVE STRENGTH TEST
Report Number: 94051418.0036
Service Date: January 3, 2006
'lrerracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client:
Transwestern Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Report Date: Feel.cacti'Q1,
Project: ,4(¢[mberPoint Business Park~
f Buildings 4, 5 and
505 South Royal Lane
Coppell, TX
Project No.: 94051418
Material Information
Specified Strength: 3600 psi ~ 28 Days
Batch Time: Plant: 3
Supplier: Lattimore
Truck No: 1106 Ticket No: 3206902
Mix I.D. No.: 1261
Field Test Data
Test
Result
Slump, inches: 4.00
Air Content, %: 3.1
Concrete Temperature,o F: 71
Ambient Temperature, o F: 66
Plastic Unit Weight, pcf: 141.6
Laboratory Test Data
Set specimen Diameter Area
No. ID (inches) (sq. inches)
1 1 6.00 28.27
1 2 6.00 28.27
1 3 6.00 28.27
1 4 6.00 28.27
Sample Information
Date Cast: January 3, 2006
Technician: Carlos D. Dotson
Weather Conditions:Clear
Accumulative Yards: 3
Placement Method: Direct Discharge
Sample Locations: Inlet at Lateral F-2, Sta. 0+12.79
Placement Location:Inlet at Lateral F-2, Sta. 0+12.79
Time:3:30pm
ification
Test Method
ASTM C143
ASTM C231
ASTM C1064
ASTM C1064
ASTM C138
Age at Maximum Compressive
Date Test Load Strength
Tested (days) (lbs)
01/10/2006 7 82,300
01/10/2006 7 81,600
Average ( 4,35~~0
01/31/2006 28 122,990
01/31/2006 28 111,750
Average 4,150
Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive
strength samples.
Technician: Carlos D. Dotson
Repod Distribution:
(1) Transwestern Commercial Services (1) O'Brien & Assoc ~
(1) City of Coppell TX (1) TechniStructures Reviewed by:
(1) City of Coppell TX Ht)ssein H. Abusaad, P.E.
(1) Rogers O1Brien Construction Co Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AAS HTO, or DOT test r~ethods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
Page I of 1
REPORT OF DRILLED PIER OBSERVATION
'Report Number: 94051418,0114
Service Date: January 25, 2006
']rl ffl!lcon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client:
Transwestem Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Report Date:
Project:
Project No.:
February 01, 2006
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
94051418
Services: Drilled pier observation.
On this date, Terracon's technician arrived at the above referenced job site as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
Technician: Daniel J. Drogos
Report Distribution: ~
(1) Transwestern Commercial Services (1) O'Brien & Asso¢
(1) City of Coppell TX (1) TechniStructures Reviewed by:
(1) City of Coppe[I TX Hussein H. Abusaad, P,E.
(1) Rogers O'Brien Construction Co Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials,
z .----_
.o--2
I11
REPORT OF DRILLED PIER OBSERVATION
Report Number: 94051418,0110
Service Date: January 24, 2006
'lrerracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client:
Transwestern Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd Ste 600 W
Dallas TX 75244
Report Date:
Project:
Project No.:
February 01, 2006
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
94051416
Services: Drilled pier observation.
On this date, Terracon's technician arrived at the above referenced job site as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
Technician: Terry Smith Insp/Testing
Report Distribution: ~
(1) Transwestern Commercial Services (1) O'Brien & Assoc
(1) City of Coppell TX (1) TechniStructures Reviewed by:
(1) City of Coppell TX Hussein H. Abusaad, P.E.
(1) Rogers O*Brien Construction Co Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company, Test results transmitted herein are only applicable
to the actual samples tested at the location(si referenced and are not necessarily indicative of the properkies of other apparently similar or identical
materials.
· o7
· o-2