Loading...
Amberpoint BP 2R-LR060127WATER INJECTION OBSERVATION 'lrerracon $901 Carpenter FrwT, Suite #100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: Location: 01/27/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Buildings #5 and #6, see attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0131 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 7th & 5th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Three (3) injection rigs were used on this date. The injectors injected pass 7 on the southeast corner of Building #5 and pass 5 on the north edge of Building #6. The main water feed line was cut at 2:25 p.m. and work was stopped until 3:00 p.m. Field Results Report To: Technician: L. Ratcliff Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99ss (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Huss~rl H. Abusaad, P.E. Senior Project Manager This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon. WATER INJECTION OBSERVATION SKETCH 'lrerracon Cc*nsultJnfl EIl[~[neer$ & Scientists 8901 Carpenter F n.v?., Suite ~100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: 01/27/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No,: Project No.: Project: 94051418.0131 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Building #5 720' 170' 5th pass Building#6 420' 7th pass completed Not to Scale N REPORT OF DRILLED PIER OBSERVATION Report Number: 94051418.0094 Service Date: January 19, 2006 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 27, 2006 Project: Project No.: 'lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX 94051418 Services: Drilled pier observation. On this date, Terracon's technician arrived at the above referenced job site as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. Technician: Terry Smith InspfTesting Report Distribution: ~. (1) Transwestern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX Hussein H. Abusaed, P.E. (1} Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical F:i° E E ~- fi_ E E E E E E E E E E · o-2 REPORT OF DRILLED PIER OBSERVATION 'Report Number: 94051418.0101 Service Date: January 20, 2006 'lrerracon 8901 Carpenter Frwy, Ste #190 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: January 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Services: On this date, Terracon's technician arrived at the above referenced job site as scheduled for ddlled pier observation. See the attached sheet(s) for recorded data. Technician: Terry Smith InspFFesting Report Distribution: ~ (1) Transw~stern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX Hussein H. Abusaad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. REPORT OF REINFORCING STEEL OBSERVATION rEffacon Date of Service: Client No.: Client: 01/27/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: 94051418.0127 Project No.: 94051418 ~ Amb?~usiness Park Project: 4,5 and6 ._,...~ildings 505 South Royal Lane Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. Civil Cl.01 PROJ EC,~I~ Drawings Utilized: .~/ /~ ~ Locations/Items Observed: Pavement (Approximately 300' x 60' Pad)~A~pproximately 450' E of NorthPoint Parking Lot Entrance located in SW corrl~r of Job Site. Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED INCORRECT ITEMS OBSERVED h and Shape I~cing Dra~ngs Approved Bar Size Proper Bar Placement ~r Grade Properly Tied Dowel Bars in Place Rebar Clean Trash & Debris Removed Proper Bar Suppods Discrepancies/Comments: Any discrep noted. INCORRECT [TEM~ OBSERVED Column Tie Spacing & Type Stirrup Spacing & Ty~e Mechanical Splices INCORRECT cted at the time of this observation unless otherwise Field Results Report To: Technician: D. Drogos Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309pdr (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0095 Service Date: January 19, 2006 ' rEffaCOll 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date:January 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 9:56am Plant: 2 Supplier: Potter Concrete Truck No: 117 Ticket No: 2289 Mix I.D. No.: 9337 Field Test Data Test Result Slump, inches: 4.75 Air Content, %: 4.3 Concrete Temperature,o F: 67 Ambient Temperature, o F: 63 Plastic Unit Weight, pcf: 151.4 Laboratory Test Data set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 Sample Information Date Cast: January 19, 2006 Technician: Dan Drogos Weather ConditionsSunny, windy Accumulative Yards:20 Placement Method: Direct Discharge Sample Locations: Pier D/5 Placement Location: Drilled Piers Specification 5-7 Time:10:17am Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 01/26/2006 7 84,660 2,990 1 2 02/16/2006 28 1 3 02/16/2006 28 1 4 03/16/2006 56 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in furl without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0095 Service Date: January 19, 2006 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Report Date: January 27, 2006 Transwestem Commercial Services Project: AmberPoint Business Park Attn: Jim Gaspard Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No.: 94051418 Material Information Sample Information Specified Strength: 3000 psi ~ 28 Days Date Cast: January 19, 2006 Time:3:46pm Technician: J. Johnson Weather Conditions: Accumulative Yards: 140 Placement Method: Direct Discharge Sample Locations: Piers E/3 & El2 Placement Location: Driiled Piers, Building ~4 Batch Time: 3:19pm Plant: 2 Supplier: Potter Concrete Truck No: 117 Ticket No: 2301 Mix I.D. No.: 9337 Field Test Data Test Result Specification Test Method Slump, inches: 6.50 5 - 7 ASTM C143 Air Content, %: 6.9 ASTM C231 Concrete Temperature,e F: 69 ASTM C1064 Ambient Temperature, o F: 60 ASTM C1064 Plastic Unit Weight, pcf: ASTM C138 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 2 1 6.00 28.27 01/26/2006 7 79,470 2,810 2 2 02/16/2006 28 2 3 02/16/2006 28 2 4 03/16/2006 56 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Terry Smith InspFFesting Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Assoc ~ (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX (1) Rogers O'Brien Construction Co Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. REPORT OF DRILLED PIER OBSERVATION 'Report Number: 94051418.0086 Service Date: January 18, 2006 refracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: Project: Project No.: January 27, 2006 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX 94051418 Services: Drilled pier observation. On this date, Terracon's technician arrived at the above referenced job site as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. Technician: Terry Smith InspFFesting Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Assoc /,'~[~ j (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX (1) Rogers O'Brien Construction Ce Hussein H. Abusaad, P.E. Senior Proiect Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cs, E E ,r- 0'4 ~ ~ ~, ~ ~ ~ > z z ~ ~ ~ .... > z z ~ ~ G.. E E E E .... ~ Z Z ~ ~ ~.. E E · '- E : ~ m ': ~ ~E ~ = '- 'E :~ ~