ST9902-CS060213February 13, 2006
Robert Caudill
Tiseo Paving Company, Inc.
419 E. Hwy 80
Mesquite, TX 75105
RE: West Sandy Lake Road Project # ST 99-02A
Submittals
Dear Mr. Caudill:
The City of Coppell requests submittals for the following items to be used on the referenced
project:
1. Water pipes
2. Valves
3. Fittings
4. RCP
5. RCB
6. Traffic control plan
In addition, there has been memion of a proposal to close North Coppell Rd during spring
break for CISD (beginning Monday, March 13) with the road to be re-opened Saturday,
March 18. Please forward your written proposal, including a proposed traffic plan, with
the other requested items as soon as possible. If you have any questions or need any
additional information, please feel free to contact me.
Office: 972/304-3684
Fax: 972/304-3570
Keith R. Marvin, P.E., Asst. City Engineer
Suzan Taylor, CIP Coordinator
Matt Atkins, P.E., Teague, Nall& Perkins
255 pARKWAY ~ P.O.BOX 947~1 1~{ COPPELL TX 75019 1~ TEL 972/462 0022 3~{ FAX 972/304 3673