Wynnpage N 2&3-CS060206COl'FELL
l:ebruary 6, 2006
Mr. Marc O. Bentley. P.E.
Bentley Engineering, Inc.
4125 Broadway Blvd., Suite A250
Garland, TX 75043
RE: Wynnpagc Plaza, l,ots 2 & 3, Block B
REVISED Fee Assessment Letter
Dear Mr. Bentley:
Enclosed is a rexised cop>' of the City of Coppell Devdopmcnt Fee Assessment table, along with a copy
of the Development Fee calculations for the refercnced development.
Please make payment for thc Impact l:ces to thc City of Coppell in thc amount of $23,341.50 and tbrward
· · ' Department along with a copy of the Fee Assessmcn table. This amount is a portiun of
to the Engineering ,
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas
Legislature. under Senate Bill .~4_~. delayed the collection of \Valor and Sewer Impact Fees until the
issuance of a Building Permit. Please provide a copy of thc l{nginccr's estimate or contract to our office
so the 2% & 4°~i~ construction inspection fee can be xerified. Thc construction inspection fees musl bc
paid prior to thc scheduled prc-cnnstruction meeting.
The additional fees Ibr x~atcr and sc~cr taps, water meters, and utility inspection fees need to be paid by
separate check at thc new Public \Vorks Set\icc Center. 816 S. Coppcll Road Meters will be ordered
when those fees are paid.
Appropriate pa)merit of thc required fees 'a ill help insnre a ,~uccessful beginning of this project. \Vc look
forward to working v, ilh you on this project. If .,.ou haxe any questions, please contact mc.
Sincercl3,
Charlene 1.a Mt~gina, k.I..
Graduate F, ngincer
CC:
Jennii('r Armstrong. Finance l)ircctor
Mar> F',clh Splctzcr. Administrati', c Secretary. Building Inspcctinns
Olelm t tollov, cll. Assistant Director of Public \Vorks
Grog Jones. ('hief Building Official
Brad P.¢id. Director of Parks and P, ccrcation
Project:
Date:
ZVELOPMENT FEE I'AB._Z
II~'nnpage Plaza, Lot,s 2 & 3, Block B
2,3/2006
TOTAl. AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fcc 57,280.00
(100% duc at Issuance of Building Permit)
Water Tap Inspection Fee S200.00
(100% duc at Issuance of Water Meter)
Water Meter Fcc (Domestic) S408.68
(100% duc at Issuance of Water Meter)
Water Meter Fee (Irrigalion/Firclinc) $281.56
(100% due at lssuancc of Waler Mctcr)
Water Meter Dcposil (Domestic) $60.00
(100% due at Issuance of ~ ater Meter)
lmgation 'Fircline Meter Deposit S60.00
(100% due at Issuance of Wa~cr Meter)
Wastc~ater Impact Fee S4,480.00
(100% duc at Issuance of Building Permit)
Wastex~atcr lap Inspection icc $100.00
( 100% due at Issuance of Building Permit)
Utility Final Inspection Fcc S 100.00
1100% duc at Issuance oFBuilding Permit)
Park Fcc S0.00 $().(}0
( I()0% duc prior to Filing Plat)
Roadway Impact Fcc 523.34].50 S23.341.50
(100% duc prior lo Filing Plat)
Street Light Fcc [nlbrmation not Axailablc
Street Sign Fcc [nlbrmation not Ax ailablc
(100% duc prior lo Acceptance of Project)
(onstruclion ]nspcclloll Fcc [nlYrmalion not Axailablc
(100% duc prior to Stal-t ol'('onstrklction) II
TOTAl_ 536,311.74
TOTAL AMOUNT I)UE I'RIOR TO FILIN(; FINAl, I'EAI 523.341.5(}
D ,/ELOPMENT FEE WORKSHL I'
PROJECT: H)'nnpage Pla~,a, Lots 2 & 3, Block B
DATE: 2/3,~006
Water Impact Fcc:
Domestic Meter(s):
Irrigation Meter(s)
Fireline Meter(s):
2 - 2 ~nch
2- 1 1/2inch
0
0
Total #: 26 ESU's @ S280.00 ea
(Due prior to issuance of building permit)
Waler Tap Inspection Fee:
Total #: 4 Connections @ $50 00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to ~ssuance of meter)
Domestic Waler Meier Fee:
Total #: 2 Domestic Meter(s) @ $204.34
(Single family due prior to ~ssuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline V~rater Meter Fee:
Total #: 2 Irrigation Meter(s) @ $14078
Total #: 0 Additional Irrigation Meter(s) @ $000
Total #: 0 Fireline Meter(s) @ $0 00
(100% due prior to issuance of water meters)
Domestic Water Meier Deposit Fee:
Total #: 2 Meter(s) @ $30 00 ea
(100% due prior to msuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30 00 ea
(100% due prior to ~ssuance of water meters)
Wastewater hnpaci Fee:
Total Domestic Meters ESU's 16
(Due prior to ~ssuance of building permit)
@ $280 O0 ea
Wastex~aler Tap Inspection Fee:
Total ¢¢: 2 Connections (¢ 550.00 ea
(100% due prior to issuance of building permit)
Utilit) Final Inspectinn Fee (All de~ehq)ments):
Total #: 2 Lots @ S50 00 ea
(100% doe prior to issuance of building permit)
16 ESU's
10 ESU's
0 ESU's
0 ESU's
$7,280.00
$2OOOO
$408.68
$281 56
$000
$000
$6O 00
$6000
$4480.00
$100.00
$100.00
Page 1
D /ELOPMENT FEE WORKSHL r
Park Fee (For Residential Dexelopments Only):
* Preliminar.~ plat approved: After October 26, 1993
Single-family @ S0 00 per lot
Multi-family @ $000 per unit
00% paid prior to Council approval of final plat)
(1
$000
S0 00
$23,341.5O
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $29260 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the ~mprovements
that are inspected by the Engineering Depadment
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROA. ¥'AY IMPACT FEE CAIAAJL,'
PROJECT:
DATE:
l. ot~ ~ & 3, Blocl, B
D),nnpage Plttztt, * '
2A:02006
ROADWAY IMI'ACT FEE:
Service Area * ]
2ategorv ** Olficc
Land Use ** General Of'rice Bldg.
Building Area (sf) I9.500
Development Units ** 19.50
Vehicle Miles per Development Unit '~* 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due {Development Units) x
(Veh c e Miles per Dc,,elopmcnl Unit) x (Fee per Vehicle Mile} $23.341.50
* (Figure 2 - Roadx~ay hnpact Fee Suds)
** (Table ~ - Roadway hnpacl Fee Stud)')
*** (Schedule 2, Page 3 - Roadx~ay Impact fee Study)
AMOtS'VTDUE: S23,341.50 I
Rhonda Brothers - Fwd: Wynnpage Plat
From:
To:
Date:
Subject:
Charlene LaMattina
Brothers, Rhonda
2/14/2006 9:19:40 AM
Fwd: Wynnpage Plat
Rhonda-
I think we faxed the revised Wynnpage fees to Greg Yancey last week. Please re-fax them to him at the
number below. I don't know if this is a new number or what.
Thank you!
Charlene
>>> "G reg Yancey" <g regyancey@verizon, net> 02/14/06 9:17 AM >>>
Are vou ouvs happy with the plat? Also, I need the engineering fees works~t when you get a chance.
Tha~ks.~r'egory K YanceyProvident Company Inc.(214) 215-9400 ~) 276-170~J
fg regyancey@verizon, net