Loading...
Wynnpage N 2&3-CS060206COl'FELL l:ebruary 6, 2006 Mr. Marc O. Bentley. P.E. Bentley Engineering, Inc. 4125 Broadway Blvd., Suite A250 Garland, TX 75043 RE: Wynnpagc Plaza, l,ots 2 & 3, Block B REVISED Fee Assessment Letter Dear Mr. Bentley: Enclosed is a rexised cop>' of the City of Coppell Devdopmcnt Fee Assessment table, along with a copy of the Development Fee calculations for the refercnced development. Please make payment for thc Impact l:ces to thc City of Coppell in thc amount of $23,341.50 and tbrward · · ' Department along with a copy of the Fee Assessmcn table. This amount is a portiun of to the Engineering , the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature. under Senate Bill .~4_~. delayed the collection of \Valor and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of thc l{nginccr's estimate or contract to our office so the 2% & 4°~i~ construction inspection fee can be xerified. Thc construction inspection fees musl bc paid prior to thc scheduled prc-cnnstruction meeting. The additional fees Ibr x~atcr and sc~cr taps, water meters, and utility inspection fees need to be paid by separate check at thc new Public \Vorks Set\icc Center. 816 S. Coppcll Road Meters will be ordered when those fees are paid. Appropriate pa)merit of thc required fees 'a ill help insnre a ,~uccessful beginning of this project. \Vc look forward to working v, ilh you on this project. If .,.ou haxe any questions, please contact mc. Sincercl3, Charlene 1.a Mt~gina, k.I.. Graduate F, ngincer CC: Jennii('r Armstrong. Finance l)ircctor Mar> F',clh Splctzcr. Administrati', c Secretary. Building Inspcctinns Olelm t tollov, cll. Assistant Director of Public \Vorks Grog Jones. ('hief Building Official Brad P.¢id. Director of Parks and P, ccrcation Project: Date: ZVELOPMENT FEE I'AB._Z II~'nnpage Plaza, Lot,s 2 & 3, Block B 2,3/2006 TOTAl. AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fcc 57,280.00 (100% duc at Issuance of Building Permit) Water Tap Inspection Fee S200.00 (100% duc at Issuance of Water Meter) Water Meter Fcc (Domestic) S408.68 (100% duc at Issuance of Water Meter) Water Meter Fee (Irrigalion/Firclinc) $281.56 (100% due at lssuancc of Waler Mctcr) Water Meter Dcposil (Domestic) $60.00 (100% due at Issuance of ~ ater Meter) lmgation 'Fircline Meter Deposit S60.00 (100% due at Issuance of Wa~cr Meter) Wastc~ater Impact Fee S4,480.00 (100% duc at Issuance of Building Permit) Wastex~atcr lap Inspection icc $100.00 ( 100% due at Issuance of Building Permit) Utility Final Inspection Fcc S 100.00 1100% duc at Issuance oFBuilding Permit) Park Fcc S0.00 $().(}0 ( I()0% duc prior to Filing Plat) Roadway Impact Fcc 523.34].50 S23.341.50 (100% duc prior lo Filing Plat) Street Light Fcc [nlbrmation not Axailablc Street Sign Fcc [nlbrmation not Ax ailablc (100% duc prior lo Acceptance of Project) (onstruclion ]nspcclloll Fcc [nlYrmalion not Axailablc (100% duc prior to Stal-t ol'('onstrklction) II TOTAl_ 536,311.74 TOTAL AMOUNT I)UE I'RIOR TO FILIN(; FINAl, I'EAI 523.341.5(} D ,/ELOPMENT FEE WORKSHL I' PROJECT: H)'nnpage Pla~,a, Lots 2 & 3, Block B DATE: 2/3,~006 Water Impact Fcc: Domestic Meter(s): Irrigation Meter(s) Fireline Meter(s): 2 - 2 ~nch 2- 1 1/2inch 0 0 Total #: 26 ESU's @ S280.00 ea (Due prior to issuance of building permit) Waler Tap Inspection Fee: Total #: 4 Connections @ $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to ~ssuance of meter) Domestic Waler Meier Fee: Total #: 2 Domestic Meter(s) @ $204.34 (Single family due prior to ~ssuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline V~rater Meter Fee: Total #: 2 Irrigation Meter(s) @ $14078 Total #: 0 Additional Irrigation Meter(s) @ $000 Total #: 0 Fireline Meter(s) @ $0 00 (100% due prior to issuance of water meters) Domestic Water Meier Deposit Fee: Total #: 2 Meter(s) @ $30 00 ea (100% due prior to msuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30 00 ea (100% due prior to ~ssuance of water meters) Wastewater hnpaci Fee: Total Domestic Meters ESU's 16 (Due prior to ~ssuance of building permit) @ $280 O0 ea Wastex~aler Tap Inspection Fee: Total ¢¢: 2 Connections (¢ 550.00 ea (100% due prior to issuance of building permit) Utilit) Final Inspectinn Fee (All de~ehq)ments): Total #: 2 Lots @ S50 00 ea (100% doe prior to issuance of building permit) 16 ESU's 10 ESU's 0 ESU's 0 ESU's $7,280.00 $2OOOO $408.68 $281 56 $000 $000 $6O 00 $6000 $4480.00 $100.00 $100.00 Page 1 D /ELOPMENT FEE WORKSHL r Park Fee (For Residential Dexelopments Only): * Preliminar.~ plat approved: After October 26, 1993 Single-family @ S0 00 per lot Multi-family @ $000 per unit 00% paid prior to Council approval of final plat) (1 $000 S0 00 $23,341.5O Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $29260 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct the ~mprovements that are inspected by the Engineering Depadment (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROA. ¥'AY IMPACT FEE CAIAAJL,' PROJECT: DATE: l. ot~ ~ & 3, Blocl, B D),nnpage Plttztt, * ' 2A:02006 ROADWAY IMI'ACT FEE: Service Area * ] 2ategorv ** Olficc Land Use ** General Of'rice Bldg. Building Area (sf) I9.500 Development Units ** 19.50 Vehicle Miles per Development Unit '~* 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due {Development Units) x (Veh c e Miles per Dc,,elopmcnl Unit) x (Fee per Vehicle Mile} $23.341.50 * (Figure 2 - Roadx~ay hnpact Fee Suds) ** (Table ~ - Roadway hnpacl Fee Stud)') *** (Schedule 2, Page 3 - Roadx~ay Impact fee Study) AMOtS'VTDUE: S23,341.50 I Rhonda Brothers - Fwd: Wynnpage Plat From: To: Date: Subject: Charlene LaMattina Brothers, Rhonda 2/14/2006 9:19:40 AM Fwd: Wynnpage Plat Rhonda- I think we faxed the revised Wynnpage fees to Greg Yancey last week. Please re-fax them to him at the number below. I don't know if this is a new number or what. Thank you! Charlene >>> "G reg Yancey" <g regyancey@verizon, net> 02/14/06 9:17 AM >>> Are vou ouvs happy with the plat? Also, I need the engineering fees works~t when you get a chance. Tha~ks.~r'egory K YanceyProvident Company Inc.(214) 215-9400 ~) 276-170~J fg regyancey@verizon, net