Loading...
WA0301-CS060210COI i:,-ELL Febmaryl0,2006 Luis Velasquez Fox Contractors, Inc. PO Box 951 Midlothian, TX 76065 WA 03-01 Loch Lane Waterline Final Acceptance Dear Mr. Velasquez: Representatives of the City of Coppcll have confirmed a final inspection of utilities for the referenced project. Thc improvements in the above referenced project were installed according to plans and our specifications governing such work. As of August 31, 2005 the facilities are accepted subject to the two-year maintenance agreement. A follow-up inspection of the facilities will be conducted prior to the lapse of the two- year bond period. If any punchlist items are noted at_th.at-time, you will be contacted to make repairs. Thank you for your cooperation d.~rFg ~is construction, and if I can be of furt2 : servicej, l~e contact me at (972~684. L~ Davis\ ~/ ~~ Co ;truction ~p~_ctor Keith R. Marvin, P.E. Off ce Phone: (972) 304-3684 Assistant City Engineer Fax: (972) 304-3570 CC: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Tim Oates, Fire Marshal