ST8805-CS 890801Jerry Parchd Consulting Engineers August 1, 1989 Mr. Buddy Echols Superintendent Coppell Independent School 1201 Wrangler Drive Coppell, Texas 75019 214/471-1111 District RE: JP No. 88023; Parkway Boulevard and High School Access Road; Parks of Coppell; Coppell, Texas Dear Buddy: Enclosed is a copy of Payment Request No. 4 ("estimate") received from L. H. Lacy for work performed on the referenced contracts from June 27, 1989 through July 25, 1989. The beginning date of the billing period shown on the estimate should be changed accordingly. This payment request was received in our office on July 24, 1989. The amounts requested for water and Sanitary sewer improvements are unchanged from previous estimates. All sanitary sewer and water improvements constructed under this contract have been previously billed to C.I.S.D. The contractors payment request includes charges for construction of the top half of all drainage inlets, Items 8, 9, and 10, in Parkway Boulevard and the High School Access Road. The storm drain inlets were completed following paving construction. L. H. Lacy requests payment for all paving improvements under this contract in estimate number 4. All concrete pavement construction has been completed, however, results of strength tests of concrete placed in the north side of Parkway Boulevard at the High School Access Road indicate that this concrete does not comply with project specifications. City of Coppell inspectors are presently investigating this matter. Item No. 9 under the Paving Improvements, Bermuda Grass in Medians, which also includes the parkways and other areas adjacent to the Right-of-Way, is not completed. The contract provides for payment for this item only after a good growth of grass is established in these areas. Areas to be grassed were hydromulched on July 27, 1989. We recommend the following adjustments to the contractors payment request number 4. 320 Westway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 Mr. Buddy Echols August 1, 1989 JP No. 88023 Page 2 of 4 Deduct charges for apparent deficient concrete placed on the north side of Parkway Boulevard. The questionable area is approximately thrity three feet wide by 87 feet long, or 319 s.y. The City will require coring and testing of the concrete actually placed in the street and utilize this information to decide whether the installed concrete should be removed and replaced. 2. Deduct charges for Bermuda Grass in Medians. The following table provides a determination of the current amount due considering recommended adjustments. ITEM NO. DESCRIPTION AMOUNT COMPLETED UNIT AMOUNT THIS PERIOD PRICE DUE DRAINAGE IMPROVEMENTS 8. 20 FT. INLET 0.5 EA. $ 3536.00 $ 1768.00 9. 14 FT. INLET 1 EA. 2475.00 2475.00 10. 6 FT. INLET 1 EA. 1061.00 1061.00 PAVING IMPROVEMENTS 1. 7" CONC. PVMT. 1940 s.y. 14.20 27548.00 2. 7" CONC. PVMT. 1346.5 s.y. 14.20 19120.30 5. HEADER 64 Ft. 2.00 128.00 6. BARRICADE 66 Ft. 15.00 990.00 7. PAVING STONES 1602.1 s.f. 2.80 4485.88 8. FENCE 2503 s.f. 2.60 6507.80 TOTAL AMOUNT THIS PERIOD $ 64,083.98 In their estimate, L. H. Lacy indicates that the amount of their previous estimate, $48,814.89, has not been paid. Recommended approval of this request was provided in our review letter to Ms. Vonita White of C.I.S.D. dated June 28, 1989. The following table provides a determination of the total recommended amount currently due. Mr. Buddy Echols August 1, 1989 JP No. 88023 Page 3 of 4 Water Improvements $ Sanitary Sewer Imrpovements Drainage Improvements Paving Improvements Total Amount of Work Completed $ Less 5% Retainage 77,804 00 25,590 40 20,809 00 123,278 28 247,481 68 (12,374 08) Total Amount Due Less Previous Payments * 235,107.60 125,412.92 Current Amount Now Due $ 109,694.68 * According to Contractors Payment Request Therefore, recommended payment on Estimate No. if the total amount of previous payments contractors' estimate is correct. 4 is $109,694.68 reported on the The City of Coppell has recently required that additional traffic buttons be installed in the westbound lanes of Parkway Boulevard to channelize traffic into the left-turn lane at the High School Access Road intersection. A design for traffic channelization was prepared by our firm and approved by the City. L. H. Lacy has informed us that the additional traffic buttons will cost $540.30. This will be billed on the next payment request. The contract completion deadline is August 7, 1989 which is this Monday. Provision of grass in seeded areas item number 9 under paving improvements - does not fall under this time constraint. The contractor should coordinate with the City to resolve the deficient concrete strength issue and insure that the constructed roadways are open to traffic no later than August 7, 1989. Mr. Buddy Echols August 1, 1989 JP No. 88023 Page 4 of 4 Paving Stones across Parkway Boulevard at Denton Tap Road must be installed in order to open the constructed roadways to traffic. As of Monday, July 31, 1989, this work had not been performed. Installation of Paving Stones across Parkway Boulevard at this location is being provided by the City of Coppell under the Denton Tap Road improvements contract. By copy of this letter to Mr. Larry Davis, the City of Coppell is requested to direct their contractor to install these paving stones as soon as possible in order that Parkway Boulevard can be opened. I will advise your office as soon as possible once the roadway opening date is known. If you have any questions, please call. Sincerely~/~ , /Jerr~Parche', P.E. JP:ch Enclosure: Payment Request No. 4 from L. H. Lacy Company cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Skip Klement/L. H. Lacy Company Mr. Gary Keep/SHWC Architects Mr. Jim Schell/Law, Snakard & Gambill Mr. Larry Davis/City of Coppell