DR9502-CN 960109(~The City With A Beauliful Fulure CTT¥ COUNCIL MEETING: January 9, 1996 ITEM CAPTION: ITEM SUBMITTED BY: TITLE: Approval of a contract with Halff and Associates Inc. for FEMA map revisions for Andrew Brown Park West, the DeForest Service Center and the existing Fire Station #1 (future Senior Citizens Center) and authorizing the Mayor to sign. .qPPROVED BY CiTY CO~N/iIL DATE __ ,/~/~ . Kenneth M. Griffin P.E. Assistant City Manager/City Engineer STAFF COMMENTS: INITIALS See attached memo. STAFF RECOMMENDATION Approval EXPLANATION: Denial Staff recommends approval of the three projects and will be available to answer any questions at the Council meeting. BUDGET AMT.$ AMT. EST.$ +/- BUD:$ FINANCIAL COMMENTS: Funds for this project will need to come from GeneralFund OndesignatedFund Balance. FINANCIAL REVIEW~ CITY MANAGER REVIEW: Agenda Request Form - Revised 1/94 Document Name eng.01 To: From: RE: D ate: Mayor and City Council Kenneth M. Griffin, P.E., ACM / City Engineer~ Approval of a contract with Halff and Associates Inc. for FEMA map revisions for Andrew Brown Park West, the DeForest Service Center and the existing Fire Station #1 (future Senior Citizens Center) and authorizing the Mayor to sign. December 29, 1995 This agenda item is brought forth to request Council approval of the referenced FEMA map revision projects. The three projects are discussed in detail below. The first project is a map revision required for Andrew Brown Park West because the future development includes fill dirt, sidewalk improvements, parking lot improvements, etc. that involve placement of fill into the existing floodplain. Council may recall that several years ago, as we began the development of Andrew Brown Park East, a similar flood study was performed. That study was also performed by Halff and Associates, as a subcontractor to Mesa Design Group. Because they performed the previous study, I have requested that they submit a proposal on this study also. Halff and Associates is one of the leading hydrology firms in this area. They are currently working with Dallas County on several FEMA submittals for the construction of Sandy Lake Road and the bridge over the Elm Fork of the Trinity River. To stay within the guidelines of our Floodplain Ordinance, this study needs to be performed and submitted to FEMA for approval prior to the actual work being performed in Andrew Brown Park West. The second project is the DeForest Road Service Center. While the Service Center might be elevated above the floodplain, it is still shown to be in the floodplain on the official FEMA map because there was not a study submitted to FEMA to remove it from the floodplain when it was constructed. The third project is the current Fire Station #1 which will be converted to the Senior Citizens Center. It is located in a designated floodplain area on the official FEMA map. It is my opinion that this should be evaluated and removed from the floodplain when it is converted to the Senior Citizens Center. I am unsure of the elevation of the existing structure in regards to the elevation of the floodplain, but according to our existing FEMA and topographic maps it should be elevated sufficiently to be out of the floodplain and this should be more of a exercise in correcting the official maps as opposed to doing a full blown reclamation. Staff recommends approval of these three projects and will be available to answer any questions at the Council meeting. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS * SURVEYORS DALLAS · FORT WORTH · HOUSTON · ARLINGTON · Mc. ALLEN ,, CHICAGO 8616 NORTHWEST PLAZA DRIVE · DALLAS, TEXAS 75225 214/739-0094 · FAX 214/739-0095 December 21, 1995 AVO 1008.95.8015 Mr. Kenneth M. ~ P.E. Assistant City Manager/Director of Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: FEMA Map Revisions Dear Mr. Griffin: HalffAssoeiates is pleased to present this fee proposal for FEMA map revisions at Andrew Brown Park (West), Deforest Service Center, and the proposed Coppell Senior Citizens Center on Coppell Road. Generally, the services will consist of a Conditional and final Letter of Map Revision application for Andrew Brown Park, a Letter of Map Amendment for the Coppell Senior Citizens Center, and a Letter of Map Amendment for the Deforest Road Service Center. The entire hydraulic engineering, permitting, and surveying effort can be completed for a lump sum fee of $28,700. A summary of the work plan and fee breakdown is shown on Exhibit A. A suggested schedule is shown on Exhibit B. Detailed Scopes of Work for the individual map amendment/revision applications are shown on Exhibits C, D, and E. Please call if I can answer any questions concerning this proposal or the map revision process. We look forward to assisting you with this important permitting effort. Sincerely, HALFF ASSOCIATES, INC. / Walter E. Skipw(th, P.E. Vice President TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT ** MUNICIPAL · ENVIRONMENTAL · STRUCTURAL SURVEYING · GLOBAL POSITIONING SYSTEM (G.P.S.) · REMOTE SENSING AND MAPPING LANDSCAPE ARCHITECTURE ,, PLANNING Exhibit A Work Plan and Fee Summary Andrew Brown Park, Deforest Road Service Center, and Coppell Senior Citizens Center Map Revisions Task Andrew Brown Park I. Base map Preparations II. Field Surveys III. Stream Hydraulics and CLOMR Application IV. As-Built survey and Final LOMR Application Subtotal Fee $1,070 $1,000 $ 8,230 $ 4,600 $14,900 CoppeH Senior Citizens Center I. Base Map Preparation. II. As-built Surveys III. Stream Hydrology, Hydraulics, and LOMA Application Subtotal Deforest Road Service Center I. Base Map Preparation. II. As-built Surveys III. LOMA Application Subtotal $1,200 $1,100 $ 8,500 $10,800 $1,080 $1,100 $ 4100 $1,920 Total $ 29,800 ' T EXHIBIT B Suggested Schedule her January I I=ebruary March I Aprili/2 May I June I July ID TaskName Duration 1712413~1 7 1~412~ 1281 4 I~ 1~8 251 3 1101~71241311 7 114121 81 5 1121~91261 21g 1161231301 7 114 I Start A Brown Park CLOMR Od "~' I/9 ~ i i i : 4 Stream HydrsulicalCLOMR Application 15d ~ 1116 ~-. 2/5 :i ii i: i 5 CLOMR Review/Approval 90d i ~}61 .... :: i : ' 6110 6 Park Construction 9Od iiii ~$i ..... ~ ~ ? ,.~,-built Survey/LO~R .~pli~tion for A Brown Park 1~ i !i i i i ! ~/1¶ ?1t - 8 Start Coppell Service Center LOMA Od i i : : : ! ""{ ,L 10 "-built Surveys 5d i i !2/12 / 2/16 ! i i i 11 Stream Hydmlogy,Hydraulics,LOMA Application 15d } 1/22' 12 ,O~.ov~./^p,~va~ ~ii; 12/12 ' ./1. 14 Base Map Preparations 5d i ~ t/22 I ~2 15 As-built Surveys 5d ! 16 LOMA Application 1Od ' , ~ i i : 1/29 17 LOMA RevlewApproval 90d ~:i i2/12 .... 6/14 Task ~ Summary ~ Rolled Up Progress Project: Coppell Map Revisions Data: 12/21/95 Progress Rolled Up Task Milestone ~, Rolled Up Milestone ~ Page 1 Exhibit C Scope of Work City of Coppell Andrew Brown Park - West Letters of Map Revision December 1995 I. Basemap Preparation A. Obtain proposed park improvements site plan from Mesa Design Group. B. Plot topography at A. Brown Park West. C Transfer Architects site plan to base map, show benchmarks on plan, add legend, notes, north arrow, sc.~le etc. D. Create a location map for the application. H. Preconstruction Surveys. A. Site Reconnassance. B. Locate and use nearest FEMA Reference Mark. C. Survey spot elevations in vicinity of proposed improvements at Park. D. Process field data and check for accuracy and closure. E. Plot survey information. Conditional Letter of Map Revision (CLOMR) application, to the Federal Emergency Management Agency_ .ITEMA). A. Flood Insurance Study Hydraulics. 1. Contact FEMA Project Library to obtain current FIS effective models. 2. Locate, execute and debug, duplicate effective FIS model, plot cross-sections and profile. 3. Compare results to current FEMA FIS effective model, update as needed. 4. Build pre-project condition model to fit improvements and include recent LOMR'S 5. Execute and debug pre-project model, plot cross-sections and profile. 6. Compare to FEMA duplicate effective (base) model, constant summary tables. 7. Locate current effective FIS Floodway model. 8. Modify Floodway model consistent with pre-project conditions model. 9. Execute and debug Floodway model, comet summary table. 10. Build CLOMR hydraulic model based on proposed changes in Park. 11. Execute and debug model, plot proposed cross-sections and profile. 12. Compare to pre-project model, prepare summary tables. 13. Modify Floodway model to reflect proposed project.. Halff Associates, Inc. 1 1008.95.8015 Exhibit C Scope of Work 14. Execute and debug model, prepare summary table. 15. Create hard copy and digital copy of effective, pre-project and proposed project hydraulic models. B. Complete FEMA CLOMR forms (MT-2) and attachments. 1. Form 1 - Revision Requester and Community Official Form. 2. Form 2 - Professional Engineer Certification Form. 3. Form 4 - Riverine Hydraulic Analysis Form. 4. Form 5 - RiverineJcoastal Mapping Form Prepare Miscellaneous tables. 1. Water surface elevation check table for CLOMR. 2. Water survaee elevation and velocity comparison table for FIS discharges. D. Project site plan. 1. Edit site plan exhibit to include proposed flood plain, floodway, benchmarks, etc. 2. Plot site plan exhibit for application. E. Revise Flood Insurance Rate Man .(FIRM). Community-Panel No. 48017 0010 E 1. Locate panel. 2. Delineate and digitize FIS FIRM map centedine, flood plain, floodway. 3. Merge FIS information with site plan exhibit. 4. Overlay proposed project delineation at FIS FIRM map scale, for modified FIRM Exhibit. F, Other exhibits. 1. Compare pre-project with proposed project FIS model cross sections 2. Geotechnical or soils report excerpts by others. 3. Profile plot comparing pre-project with proposed project conditions. HalffAssociates, Inc. 2 1008.95.8015 Exhibit C Scope of Work G. Report Writing 1. Letter of transmittal. 2. Table of contents, figures, addenda, and list of tables. 3. Project description. 4. Compile photographs for report.. H. Assemble CLOMR annlication 1. Generate report,edit as needed. 2. Review, sign and seal report and plans. 3. Copy report and exhibits 5 times. 4. Assemble and bind 5 copies of report. I. CLOMR Submittal 1. Meet with the City for review and signatures 2. Submit to FEMA Headquarters via overnight mail. The Initial Review Fee ($560) is not included in the budget. Additional review and mapping fees will be required but mounts are unknown at this time. These additional fees are not a part of this budget. 3. Mall copies to FEMA Region VI office. J. CLOMR Review and Coordination 1. Publish public notice of flood plain change in the official local newspaper. 2. Coordination with FEMA during review stage. IV. Final letter of Map Revision (LOMR) Application to FEMA. (Scope and Budge1~ assume Project is built as planned and revisions to CLOMR hydraulics are not needed. A. As built surveys. B. Update Site Map with As-built survey information. C. Complete LOMR Forms (MT-2) and attachments. 1. Form 1 - Revision Requester and Community Official Form. 2. Form 2 - Professional Engineer Certification Form. 3. Form 4 - Rivefine Hydraulic Analysis Form. 4. Form 5 - Riverine/coastal Mapping Form. D. Assemble LOMR ~pplicatio~a. HalffAssoeiatcs, Inc. 3 1008.95.8015 Exhibit C Scope of Work E. LOMR Submittal to FEMA Headouarters. F. LOMR review and coordination. V. Items to be Provided by City_. as Necessary_ and When Available. · City topographic mapping electronic files. · Review and Application fees, if any. · Plats · Site plans · Deeds · Compaction test results. · Geotechnieal studies. VI. Tasks Not Included in Scope. 404 (Wetlands) permit applications. Other special enviromental studies. Drainage or flood control design services. Preparation of Construction Documents. Boundary surveys. HalffAssociates, Inc. 1008.95.8015 Exhibit D Scope of Work City of Coppell Coppell Senior Citizens Center Letter of Map Amendment Application December 1995 I. Bnsemnp Preparation A. Obtain proposed site plan. B. Plot topo at proposed Coppell Senior Citizens Center. C. Transfer site plan to base map, show benchmarks on plan, add legend, notes, north arrow, scale etc. D. Create a location map for the application. H. As-Butt Surveys. A. Site Reconnassance. B. Locate and use nearest FEMA Reference Mark. C. Survey first floor elevations and spot elevations in vicinity of Center. D. Process field data and check for accuracy and closure. E. Plot survey information. Lc_ti_er of Map Amendment LOMA application, to the Federal Emergency Management ,Agency (FEMA). A. Flood Insurance Study Hydraulics and Hydrology. 1. Contact FEMA Project Library to obtain currem FIS effective models. 2. Obtain LOMR information for recent nearby nearby projects from consultants. 3. Locate, execute and debug, Stream G-1 hydraulics model, plot cross-sections and profile. 4. Compare results to current FEMA FIS effective model, update as needed. 5. Determine FIS discharges at Coppell Road using Coppell Storm Water Mgmt. Study HEC-1 Model. 6. Extend FIS hydraulic model to Coppell Road for revised existing conditions. 7. Execute and debug revised FIS model, plot cross-sections and profile. 8. Locate current effective FIS Floodway model. 9. Modify Floodway model consistent with revised FIS model. 10. Execute and debug Floodway model, consmmt summary table. HalffAssociates, Inc. 1 1008.95.8015 Exhibit D Scope of Work ll. 1. 2. 3. 4. C. 1. 2. D. 1. 2. E. 1. 2. 3. 4. Create hard copy and digital copy of effective, pre-project and proposed project hydraulic models. Comulete FEMA LOMA forms (MT-l) and attachments. Form 1 - Property information. Form 2 - Elevation information. Form 3 - Hydrologic Analysis (MT-2) Form 4 - Riverine Hydraulic Analysis Form (MT-2). Pre~are Miscellaneous tables. Water surface elevation check table for LOMA. Water survaee elevation and velocity comparison table for FIS discharges. Project site plan. Edit site plan exhibit to include corrected flood plain and floodway, benchmarks, etc. Plot site plan exhibit for application. Revise Flood Insurance Rate Map .(FIRM). Community-Panel No. 48017 0010 E Locate panel. Delineate and digitize HS FIRM map centerline, flood plain, floodway. Merge FIS information with site plan exhibit. Overlay delineation's at FIS FIRM map scale, for modified FIRM Exhibit. F. Other exhibits. 1. Plot cross sections for revised FIS model cross sections. 2. Soils information. 3. Profile plot. G. Report Writing 1. Letter of transmittal. 2. Table of contents, figures, addenda, and list of tables. 3. Project description. 4. Compile photographs for report. HalffAssociates, Inc. 2 1008.95.8015 Exhibit D Scope of Work H. Assemble LOMA application 1. Generate report,edit as needed. 2. Review, sign and seal report and plans. 3. Copy report and exhibits 5 times. 4. Assemble and bind 5 copies of report. I. LOMA Submittal Meet with the City for review and signatures Submit to FEMA Headquarters via overnight mail. An Initial Review Fee is not included in the budget and should not be required as long as submittal is for map correction. Mail copies to FEMA Region VI office. J. LOMA Review and Coordination IV. Items to be Provided by Ci _ty. as Necessary_ and When Available. · · · · · · City Topographic Mapping Electronic Files. Review and Application fees, if any. Plats Site Plans Deeds Geotechnical Studies. V. Tasks Not Included in Scope. 404 (Wetlands) permit applications. Other special environmental studies. Preparation of Construction Documents. Boundary Surveys. Halff Associates, Inc. 3 1008.95.8015 Exhibit E Scope of Work City of CoppeH Deforest Road Service Center Letter of Map Amendment Application December 1995 I. Basema_n Pre_naration A. Obtain site plan. B. Obtain electronic files for city topographic maps. C. Plot topo at Deforest Road Service Center. D. Transfer site plan to base map, show benchmarks on plan, add legend, notes, north arrow, scale etc. H. As-Built Surve_vs. A. Site Reconnassance. B. Locate and use nearest FEMA Reference Mark. C. Survey first floor elevations and spot elevations in vicinity of Center. D. Process field data and check for accuracy and closure. E. Plot survey information. me HalffAssociates, Inc. Letter of Map Amendment LOMA applieafion~ to the Federal Emergency_ Management ,agency_ (FEMA). Obtain LOMR information for recent omiects from consultants. Complete FEMA LOMA forms fl~4T-1) and atta___chrnents. Form 1 - Property information. Form 2 - Elevation information. Pr~_ are elevation tables. Project site plan. Edit site plan exhibit to include corrected flood plain and floodway, benchmarks, etc. Plot site plan exhibit for application. I 1008.95.8015 Exhibit E Scope of Work 1. 2. 3. F. 1. 2. 3. 4. G. 1. 2. 3. 4. H. Revise Flood Insurance Rate Man ~IRM) Communi _ty-Panel No. 48017 0010 E Delineate and digitize FIS FIRM map centerline, flood plain, floodway. Merge FIS information with site plan exhibit. Overlay delineation's at FIS FIRM map scale, for modified FIRM Exhibit. Report Writing Letter of transmit. Table of contents, figures, addenda, and list of tables. Project description. Compile photographs for report. Assemble LOMA application Generate report, edit as needed. Review, sign and seal report and plans. Copy report and exhibits 5 times. Assemble and bind 5 copies of report. LOMA Submittal 2. 3. I. Meet with the City for review and signatures Submit to FEMA Headquarters via overnight mail. An Initial Review Fee is not included in the budget and should not be required as long as submittal is for map correction. Mail copies to FEMA Region VI office. LOMA Review and Coordination IV. Items to be Provided by City_, as Necessary and When Available, · · · · · City Topographic Mapping Electronic Files. Review and Application fees, if any. Plats Site Plans Deeds Geotechnical Studies. Halff Associates, Inc. 2 1008.95.8015 Exhibit E Scope of Work V. Tasks Not Included in Scope. 404 (Wetlands) permit applications. Other special environmental studies. Preparation of Construction Documents. Boundary Surveys. Haiti'Associates, Inc. 1008.95.8015