Loading...
Amberpoint BP 2R-LR060122WATER INJECTION OBSERVATION 'lrerracon 8901 Carpenter F n~/., Suite #/00 Dallas Texas 75247 (214) 630-1010 Date of Service: 0]/25/06 Report No.: Client No.: 50854 Project No.: Client: Transwestern Commercial Services Project: 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 94051418.0116 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Location: Procedure: Building #5, from E end to 350' W General Contractor: Rogers-O'Brien Construction Co. and N side to 70' S Injector: Jowell On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No,: 7th No. of Probes: 4 Probe Length: 7 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: The 7th pass of water injection started along the north side of the building pad at the east end °f the pad. Very hard material was encountered at variable depths of 3 feet to 6 feet from the east end to 220 feet ± westward and from the north side to 50 feet south. The injection contractor was unable to penetrated this hard material at several locations. NOTE: Injection rigs bent several injection rods throughout the day plus minor mechanical problems contributed to a small area being injected on this date. In the afternoon, the injection contractor was advancing the rods too fast at each 18 inch interval, not allowing refusal of water. The spacing between injections was too far apart in the afternoon. Field Results Report To: Technician: J. Perdue Report Distribution: (1) Transwestern Commercial Services (1) Ci[y of Coppell TX (1) City of Coppell TX 99pdr (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.