Amberpoint BP 2R-LR060128WATER INJECTION OBSERVATION
'lrerracon
ConsuItin(i EnflJneers & Scientists
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Date of Service:
Client No.:
Client:
Location:
**REVISED Report Date:
01/;28/06 Report No.:
50554 Project No.:
Transwestem Commercial Services Project:
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
**Building #6, see attached sketch
General Contractor:
Injector:
02/14/06
94051418.0134
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Rogers-O'Brien
Jowell
Procedure:
On this date, a Terracon technician observed the injection of water at this site. During the
injection process, the following observations were recorded.
Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments: **This report was REVISED on 02/14/06 by adding "Building #6" to the Location.
Field Results Report To:
Technician: T. Mitchell
Report Distribution:
(1) Transwestem Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
99sks
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon
WATER INJECTION OBSERVATION SKETCH
'lreffacon
Consultine Engineers & Scientists
8901 Carpenter Frwy, Suite #100
Dallas, Texas 75247
(214) 530-1010
Date of Service:
Client No.:
Client:
**REVISED Report Date:
01/28/06 Report No.:
50854 Project No.:
Transwestem Commercial Services Project:
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
02/14/06
94051418.0134
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Not to Scale
N
W<~>E
S
Building#5
Building#6
720'
> < 400'
3Rigs
WATER INJECTION OBSERVATION
'l Effacon
Dallas, Texas 75247
(2141630-1010
Date of Service:
Client No.:
Client:
Location:
01/28/06
50854
Transwestem Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
See attached sketch
Report No.:
Project No.:
Project:
General Contractor:
Injector:
94051418.0134
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Rogers-O'Brien
Jowell
Procedure:
On this date, a Terracon technician observed the injection of water at this site. During the
injection process, the following observations were recorded.
Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Field Results Report To:
Technician: T. Mitchell
Report Distribution:
(1) Transwestern Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
99pdr
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon.