Loading...
Wynnpage N 2&3-CS060220zSB mley n2 February 20, 2006 Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Coppell, Texas 75019 Re: Wynnpage Plaza North Phase 2 BEI No. 25106 Dear Mr. Griffin: We are requesting that the on-site pavement be 6 inch thick 4000 PSI reinforced concrete pavement with #3 rebar on 18 inch centers in both directions on 6 inch compacted subgrade This request is being made in lieu of lime stabilizing the subgrade. we would appreciate your consideration of our alternate pavin9 section. If you should have any questions or concerns, please do not hesitate to call Sincerely, BENTLEY ENGINEERING, INC. Marc O. Bentley, P.E. '~?~ 240 hq22 972 24E~ Z Bentley FACSIMILE TRANSMITTAL TO: E.,M.,..-I c..,= SUBJECT: I I I PAGES: ~-~ (iNCLUDING COVER) FROM: Marc O. Bentley, P.E. DATF: BEI #: COPIES TO: N©TEg: PLEASE ADVISE IF ALL PAGES ARE NOT RECEIVED. 4125 Broadway Blvd., Suite A250 Garland, Texas 75043 Phone: j972) 240 4821 Fax: (972) 240-0922