ST9902-CS060214 (2)419 East Highway 80
PAVING COMPANY
P,O. Box 270040 Dallas, Texas 75227-0040 Tel (972) 289-0723 Fax (972) 216-5637
Fcbruar7 14, 2006
C:ly ol Coppcll
255 Parkway
Coppell, Tex:t~ 78019
Tel. (972)304-3684
F~ (972)304-3570
Attn: l,arry Day s
Re: WeSt '
Sandy Lake Road ST 99-02A
Dear Mr_ Davis
As discusscd, Tiseo Paving Co. would like to take advanlagc of thc Coppcll lSD
spring break the week o£March 13.2006 to shut down Coppell Road Norlh at
Sandy Lake Road, Allowing J.T. Dersner to in~all the 48" Storm Drain C-I from
Sra. 1+25 to S~a. 4+58, providing th~ oull~.ll lbr Drainage System "C' in Stage I
without cffccling school traffic.
Wc will provide an additional mesxage board at a location of your choice, one
wt;ck prior and during this con~n]c~ion, in an aUcmpl to inlbrm the driving public
so they may seek an ahemate route. Also installing appropriale Iraf'tjc control
devices to insure thc ~1~:ry of vehlcular and pedestrian traffic during this w~)rk.
[ am available to d|scuss this matter at yomr convenience.
cc: John Skinner, I.T, l')e~ner,