SS9901-CN060217CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Deforest Rd & Sandy Lake Rd. Lift Station Improvements SS 99 -01 CONTRACTOR: Can -Fer Construction Company OWNER: City of Coppell CHANGE ORDER NO.: Three (3) DATE: January 10, 2006 Item Description Quantity Unit Unit Price Total Add: New Valve Support @ 30" Resilient 1 EA 666.74 $666.74 Wedge Gate Valve in ValveVault Furnish and Install pipe Clevis 2 EA 221.75 $443.50 Hangers Remove and Replace 16" Piping 1 LS 6,385.15 $6,385.15 Total Re visio n to Contract Amo / Change Order # 3 $ 7,495.39 Original contract amount $2,586,625.00 Net increase in contract amount Change Order # 1 $1,130.00 Net increase in contract amount Change Order # 2 $18,721.30 Net increase in contract amount Change Order # 3 $7,495.39 Revised contract amount $2,613,971.69 Net increase in contract time of completion 2 Days Re contract t o co mpl e ti o n 3 384 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. mmended by City Engineer Date 1 pted by City Date Agreed to by Contr for Date Change Order Proposal -0005 Deforest Rd. & Sandy Lake Rd. Lift Station Improvements Serial Letter No. Contract No. SS 99 -01 Date February 2,2006 Work Description. Remove and replace 16" piping Engineer: TurnerCollie &Braden 17300 Dallas Parkway Suite 1010 Dallas,TX 75248 Contractor: CAN -FER Construction Company 11031 Grissom Lane Dallas,TX 75229 Labor Material Equipment Subcontractor TOTALS $ 1,966.02 $ 412.87 $ 1,060.05 $ 1,950.00 $5,388.94 CAN -FER Insurance 1 4% $7545 Subtotal $5,464.39 Overhead(Home Office) - 8 5% Subcontracted Work $46447 Subtotal $5,928.86 Profit Subcontracted Work 6 0% $35573 Subtotal $6,284.59 Overhead(Home Office) - 8 5 %Self Performed Work $0 DO Subtotal $0.00 Profit -12% Self Performed Subtotal $0 00 Subtotal $6,28459 Bond 16% $10055 Total $6,385.15 * ** 2_ day time extension. * ** Work Description: Remove and replace 16" piping LABOR RT HRS OT HRS UNIT RT RATE OT RATE TOTAL Project Manager 2 0 MH $45.00 $45.00 $ 90.00 Superintendent 8 0 MH $37.50 $37.50 $ 300.00 Craft Supt 0 0 MH $33.75 $3375 $ - Foreman 8 0 MH $25.00 $37.50 $ 200.00 Carpenter 0 0 MH $18.00 $27.00 $ Operator - Crane 0 0 MH $22.00 $33.00 $ - Operator 8 0 MH $17.00 $25.50 $ 136.00 Pipe Layer 32 0 MH $18.00 $27.00 $ 576.00 Laborer 0 0 MH $12.00 $18.00 $ - Field Engineer 0 0 MH $22.00 $33.00 $ Field Engineer Asst. 0 0 MH $18.00 $27.00 $ Rodman 0 0 MH $15.00 $22.50 $ Subtotal 1 LS I $ 21.63 $ 1,302.00 Labor Burden 43% 1 LS $ 1.97 $ 559.66 Frin a Banefa 8% 1 LS $ 117.96 $ 104.16 Total Labor 1 LS $ 7.86 $ 1,966.02 NON -TAXED MATERIAL QTY UNIT UNIT PRICE TOTAL PC 200 Trackhoe 0 LF $22.50 $ 0 DAY $0.00 $ 185 CFM Air Compressor 0 DAY $0.00 $ 0 LS $0.00 $ Subtotal - Non -Taxed Material 0 $ TAXED MATERIAL QTY UNIT UNIT PRICE TOTAL Fuel Oil 8 Gease 35% of Equipment) 0 $0.00 $ Tax 0 8.25% 0 $0.00 1 $ Total Equipment 0 $0.00 $ 0 $0.00 $ Subtotal - Taxed Material + 8.25% Tax GENERAL CONDITION MATERIAL Jobsite Trailer 2.3% Labor QTY 1 UNIT LS UNIT PRICE $ 45.22 $ TOTAL $ 45.22 Jobsite Phone 2.2% Labor 1 LS $ 43.25 $ 43.25 Jobsite Electric 1.1% Labor 1 LS I $ 21.63 $ 21.63 Jobsite Water 0.1 % Labor 1 LS $ 1.97 $ 1.97 Small Tools 6% Labor 1 LS $ 117.96 $ 117.96 General Cleaning 0.4% Labor 1 LS $ 7.86 $ 7.86 Dum ster 0.7% Labor 1 LS $ 13.76 $ 13.76 Temporary Toilets 0.6% Labor 1 LS $ 11.80 $ 11.80 Safety Equipment 3% Labor 1 LS $ 58.98 $ 58.98 Pickup Trucks 3 Labor 1 LS $ 58.98 $ 58.98 Subtotal - G C Material + 8.25 % Tax $ 412.87 Total Material $ 412.87 EQUIPMENT QTY UNIT RATE TOTAL PC 200 Trackhoe 1 DAY $555.00 $555.00 0 DAY $0.00 $0.00 185 CFM Air Compressor 1 DAY $185.00 $185.00 0 LS $0.00 $0.00 Total 0 $0.00 Subtotal - Equipment $ 740.00 Fuel Oil 8 Gease 35% of Equipment) $ 259.00 Tax 0 8.25% 1 $ 61.05 Total Equipment $ 1,060.05 SUBCONTRACTOR QTY UNIT UNIT PRICE TOTAL Hanson Pie 1 LS $1 $ 1,950.00 0 LS $0.00 $ - 0 LS $0.00 $ 0 LS $0.00 $ - Total $ 1,950.00