Loading...
Vista Ridge 1R-8 D-CS060215'~~OWDEY, ANDERSON & ASSOCIATES, INC. CIVIL ENGIN[ERS 5225 Village Creek Drive Suite 200 Piano, Texas 75093 9Z2-931-0694 972-93L9538 Fax February 15, 2006 Mr. Larry Davis Development Construction Inspector City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Landscape finalization along Plaza Boulevard Coppell, Texas DAA Job No. 03072C Dear Larry: The schedule to complete the landscaping irrigation and lighting is as follows: 1. Street light conduits and bases (28 lights) 2 to 3 weeks (finish March 6) 2. Sidewalks and Monumentation 2 to 3 weeks (finish March 31) 3. Install landscaping 2 to 3 weeks (finish April 21) 4. Install street Fights and cleanup 1 week (finish April 30) The areas that we intend to improve are the common areas in the roundabout, the north- south common area (east of Plaza Boulevard) and at the entry along SM ! 21. We are waiting to install these improvements until the roadway infrastructure has been finalized so that we do not conflict with this acceptance process. Hopefully the weather will cooperate. If you have any questions, please contact me. Sincerely, cc: Darron Ash Neal Heckel Clay Thomas