Loading...
Northlake Estates-CS060222COPPELL MEMORANDUM TO: Jermifer Armstrong, Finance Director VIA: ~"' Keith R. Marvin, P.E., Assistant Director of Engineering FROM: (~"Charlene La Mattina, Graduate Engineer DATE: February 22, 2006 REF: Refund of Permit Fees, 817 Howell Drive Construction Development Permit fees were paid on February 15, 2006 for a new sewer tap at 817 Howell Drive. Prior to commencement of work under the permit, the existing sewer tap that served the lot ~vas located. Therefore, the new sewer tap will not be necessary. Permit fees paid for the new sewer tap should be refunded to the developer because the work will not be performed. The total refund comes to $176.00. Please refund this amount to: GR8 Enterprises LLC DBA Gem Capital Services 4347 W Northwest Hwy Ste 120-343 Dallas TX 75220 Thank you tbr your attention to this matter. If you have any questions, please call me at extension 3681. NORTH DALLAS BAN & TRUST CO. ': & I, ~oooq&ol: ~,~ N?q5 1 O25 Dollars ~...~."~--~ O ~,0 2 c~ Project: 817Howell Date: 2/15/2006 DEVELOPMENT FEE TABLE TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $0.00 (I 00% due at Issuance of Building Permit) Water Tap Inspection Fee $0.00 (100% duc at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% duc at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation~Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) l} Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II tOTAL $100.00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 DEVELOPMENTFEE WORKSHEET PROJECT: 817 Howel! DATE: 2/15/2006 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 0 0 Fireline Meter(s): 0 Total #: 0 ESU's @ $900.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 (Due prior to issuance of building permit) @ $90000 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) 0 ESU's 0 ESU's 0 ESU's 0 ESU's $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50.00 $50.00 Park Fee (For Residential Developments Only): Page 1