Loading...
Amberpoint BP 2R-LR0601318904 Carpenter Envy, Suite #100 DalLas, Texas 75247 (214) 630-1010 Date of Service: 01/31/06 Report No.: Client No.: 50854 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 94051418.0143 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Location: Building #5, see attached sketch General Contractor: Rogers-O'Brien Injector: Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 8th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Three (3) injection rigs were used in the morning and four (4) injection rigs were used in the afternoon. The injection operation was delayed for equipment and injection begin at apporximately 9:30 a.m. Field Results Report To: Technician: L. Ratcliff Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99 (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hus~Abusaad, P.E. Senior Project Manager This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without writ[eh approval of Terracon. WATER INJECTION OBSERVATION SKETCH ' rracon 8901 Carpenter F~vy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: 01/31/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0143 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX 720' 170' Building#6 420' > Not to Scale N S