Loading...
WA9801-CS 981030Texas Department of Transportation City Coppell Proposed Water line Permit RO. BOX 3067 · DALLAS, TEXAS 75221-3067 · (214) 320-6100 October 30, 1998 SH 121 Dallas County CS: 312-02 Mr. Gary C. Hendricks, PE Shimek, Jacobs & Finklea, L.L.P. 8333 Douglas Ave, # 820 Dallas TX 75225-5816 Dear Mr. Hendricks: In regards to your October 19, 1998 letter concerning the two alignment issues, TxDOT offers the following. 1. TxDOT provides for aerial utilities to be placed in the first three feet of the right of way. Three to ten feet is for any underground utility. The Dallas District generally does not dictate the alignment for any utility. Only that the alignment must be a set distance uniform with the right of way line. 2. As far as exceptions to deviate from the ten foot alignment, TxDOT only considers this option when the first ten feet is full of utilities and other considerations warrant such justification. If the existing fiber lines deviates as indicated in your letter, the owner of the fiber cable will either have to completely adjust the line or more the necessary areas in conflict to prevent the cable from being cut during the installation of the water line. At this point, TxDOT does not consider adequate justification exists to warrant an exception. As for the existing trees, if the city is unwilling to remove them, the water line can either be bored under the trees or placed on easement. If you have any questions please contact Murray Allen at (214) 320-6648. An Equal Opportunity Employer