1. The proposed change in grade and elevation of the 33" RCP from approximate STA 5+98
through STA 8+99 was received from Teague, Nail & Perkins and forwarded to Tiseo to
alleviate the conflict with TXU's underground duct bank.
2. Contractor installed the fire hydrant at approximate STA 24+39.
3. Contractor began lowering the existing 12" water main at approximate STA 18+00 and
approximate STA 15+60.
4. Contractor relocated and tested the fire hydrant at approximate STA 49+40.
5. Contractor cut and plugged the existing 10" water main at approximate STA 52+40.
COl'FELL
PROJECT
PROJECT NO.
OWNER
UONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
{SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
/-~lT_lw IT IF IS IS I
SI ~l~a~ (LEAR OVERCAST RAIN SNOV~
I AVERAGE FIELD FORCE
NAME O~ C ON'I~ACTOR NON-MANUAL
VISITORS
REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
,'-/' a // .', -- ' - /~ ' ' -; '
/ /- f
SIGNATURE
PUBLIC WORKS INSPECTOR
COl'F-ELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W, SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
AVERAGE FIELD FORCE
NAMFE OF ( ONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COl'FELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DALLY CONSTRUCTION REPORT
DATE '~ ' ~' ~ REPORT//
]M [LI~ /~F Is Is ~
AVERAGE FIELD FORCE
NAME OF CONTRA{ TOR NON-MANI. JAL
VISITORS
TIME REPRESENTATIVE REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COl'FELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DALLY CONSTRUCTION REPORT
DATE~ '/~& REPORT//
WEATIIER ] S[~ CLEAR OVERCAST RA~ r SNOW
AVERAGE FIELD FORCE
NAMt OF CON~]~A('TOR
REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COl'FELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DALLY CONSTRUCTION REPORT
DATE 5 ' ?' ~C~ REPORT~
D,v In I~lw IT IF iS iSI
WEATIIER SUN CLEAR OVERCAST RAIN [ SNOW
AVERAGE FIELD FORCE
NAME OF CONI'RACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT TIlE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
T H E · C I T Y . 0 F
COl'FELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DALLY CONSTRUCTION REPORT
REPORT#
LM ITI~>ITIF Is rs i
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
7
SIGNATURE
PUBLIC WORKS INSPECTOR
COPPELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PR~IECTINSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPEEL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
"A'E A TItER SUN CLEAR OVERCAST RAFN [ SNOW
AVERAGE FIELD FORCE
N a. MIlE OF CON']I'RA ( TOR NON_MANUAL
VISITORS
TIME
REPRESENTATIVE REPRESENTING
REMARKS
EQUIPMENT AT TIlE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBI.IC WORKS INSPECTOR
T H E . C I T Y . 0 F
CoPPELL
DAILY CONSTRUCTION REPORT
PROJECT W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
PROJECT NO. ST 99-02
OWNER CITY of COPPELL WEATIIER
TEMP
CONTRACTOR TISEO PAVING x,v I ND
PROJECT INSP LARRY DAVIS
DATE ~'~ ~/~'~:~ REPORT#
IM ITIW ITI~.~S IS I
AVERAGE FIELD FORCE
NAME OF CON~fRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COP?-Ei3
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRy DAVIS
DAILY CONSTRUCTION REPORT
IL'~ITIw ITIrlsls I
AVERAGE FIELD FORCE
NAME OF CONYRACTOR
NON-MANq3AL MANUAL
REtvLaRKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COPi:'ELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
AVERAGE FIELD FORCE
NON-MANUAL MANUAL It. EMA~KS
VISITORS
TIME
REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COPFELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
[M IT lC?IT IP IS IS I
AVERAGE FIELD FORCE
NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
_. . i ~ ...... -// ·
SIGNATURE
PUBLIC WORKS INSPECTOR
COPPELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
DATE '~ ~/~ ~ REPORT,
IM IT Iw ItglF Is Is I
AVERAGE FIELD FORCE
N~ OF CONTRACTOR
NON-MANUAL MANUAL P~VIARK$
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COFPELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W. SANDY LAKE ROAD
(SH 121 to Coppeli Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DALLY CONSTRUCTION REPORT
DATE ~'~ ] 7' ~'~z~t~ REPORT #
]M ITtw IT 1~91s Is I
AVERAGE FIELD FORCE
NAbiE OF CONTRACTOR NON-MANUAL
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
:U % O%KS,NSPEUTOR
COPPELL
DAILY CONSTRUCTION REPORT
PROJECT W. SANDY LAKE ROAD DATE ~
(SH 121 to Coppell Rd N) ~._/.~ REPORT #
PROJECT NO. ST 99-02 o*Y
OWNERCITY of COPPELL ~A~R ~ C~ O~CA~ ~ I S~OW
CONTRACTOR TISEO PAVING ~mITyW~
PROJECT INSP LA~Y DAVIS
S, VERAGE FIELD FORCE
NAM]~ OF CONTRACTOR NON-MANUAL MANUAL REMAR]CS
VISITORS
TIME REPRESENTATIVE REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
T H E ' C I T Y ' 0 F
C-OP?ELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
DATE ~ ~
o~ }M I~lw IT IF Is Is I
AVERAGE FIELD FORCE
NAM~E OF CONTRACTOR
NON-MANUAL
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
~ .- .r .......
~IuGB~I3 cT wURoERKs INSPECTOR
COPi -EL[
DAILY CONSTRUCTION REPORT
PROJECT W. SANDY LAKE ROAD DATE -~ '~ ~ REPORT #
(SH 121 to Coppell Rd N)
PROJECT NO. ST 99-02 DAY I M [ T I ~1 T } F I S I S I
OWNER CITY of COPPELL W~ATHER ~ C~ O~CA~ ~ [ SNOW
CONTRACTOR TISEO PAVING ~ITY w~ D~ S~I MM MM H~d High Rzpo~ No
PROJECT INSP LA~Y DAVIS
AVERAGE FIELD FORCE
NAME OF CONTP. ACTOR NON-MANUAL MANUAl,
/
KEMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COFFELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W. SANDY LAKE ROAD
(SH 121to CoppellRd N)
ST ~-~
CITY ofCOPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
DATE ~ - Z ~ -~ REPORT#
DAY
IM [T[W I~IF IS [S I
~ ~ o,~,,s~ ~ I s~ow
NON-MANUAL MANUAL
KEMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Ae~ /~,.7 5;r ~I~.~ ..,~-, ,~r
SIGNATURE
PUBLIC WORKS INSPECTOR
COFFELL
DAILY CONSTRUCTION REPORT
(SH 121 to Coppell Rd N)
PROJECTNO. ST99-02 DAY I~ IT l w I x~s Is I
OWNER CITY of COPPELL WEATHER SU~ CLEAR OVERCAST RAI~ I SNOW
CONTRACTOR TISEO PAVING HUMIDIFyWEND Dry~ill MOdMod llishHulllidRegort NO
PROJECT INSP LARRY DAVIS
AVERAGE FIELD FORCE
NON-MAN~AL MANUAL
VISITORS
TIME REPRESENTATIVE
REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
T H E * C I T Y 0 r
COPPELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
DAILY CONSTRUCTION REPORT
W. SANDY LAKE ROAD DATE ~' ~2'~ REPORT'
(SH 121 to Coppell Rd N) I~
ST99-02 1~^¥ IT IW IT IF IS [S ]
CITY of COPPELL WEATHER SUN CLEAR O~RCAST RA~ I SNOW
~MP To 32 32-50 50-70 ~0~5 85 up
TISEO PAVING HUM~ITyWIN~ D~StBi MoaM°d H~dHigh Repo~ NO
LARRY DAVIS
AVERAGE FIELD FORCE
NAM~ OF CONTRACTOR
NON-MA,~AL [ MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE ;rEPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
- - '~', ; ' - ' · / - /', ' /
SIGNATURE
PUBLIC WORKS INSPECTOR
T H E · C I T Y 0 F
CO??ELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECTINSP
W. SANDY LAKE ROAD
(Slt 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
DAY IM ['~W IT IF Is Is ]
AVERAGEFIELDFORCE
NAME OF CONTRACTOR
NON-MANI~AL
MANUAL I REMARKS
~'ORi REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COFFELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DALLY CONSTRUCTION REPORT
~,-~
o^¥ IM IT I~[T IF IS IS I
AVERAGE FIELD FORCE
NA~{E OF CONTRACTOR
VISITORS
TIME REPRESENTATIVE
NON-MANUAL MANUAL REMARKS
REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
:ONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
COPPELL
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSP
W. SANDY LAKE ROAD
(SH 121 to Coppell Rd N)
ST 99-02
CITY of COPPELL
TISEO PAVING
LARRY DAVIS
DAILY CONSTRUCTION REPORT
DATE ~ ~ ff F~ REPORT #
Im ]TIW IT~ISIs I
WEATHER SUN CLEAR OVERCAST RAIN ] SNOW
TEMP TO 32 32-50 50-70 70-85 85 up
AVERAGEFIELD FORCE
NAMIE OF CONTRACTOR
NON-MAN"UAL MANUAL R3EMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
..... [/- - ,
SIGNATL~E
PUBLIC WORKS INSPECTOR