Park West CC(02-2)-LR060228CONCRETE CYLINDER TEST REPORT
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfod Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 229
REG PROJECT NO. 12468
SAMPLE DATE: 02-21-06
TECHNICIAN: J. Seeton
PAGE: 1 of 1
Location of Sample
Set Number I Location
1
Sidewalk: 640'N from SW corner of Bldg. B
Design Information
Quantity Represented
10/20
Specified Strength p.s.i.
3000
Source of Concrete
Mix Identification
TXI 8271
Test Results
Set Cylinder Age @ Total Load
No. ID Date Tested Test lbs.
1 8777 02-28-06 7 72020
8777 03-21-06 28
8777 03-21-06 28
8777 Hold H
Compressive Average
Stren~lth p.s.i. Stren~lth p.s.i.
2550
Cylinder Data
Set I Cylinder
[ NlO. ID Slump
8777 6.0
Time of Concrete Air Ticket
Sample Air Temp. Temp. Entrainment Number
10:50AM 40 50 7.0 208099
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
Cadence McShane Corporation/
Mr. Bobby Parer
Commerce Construction Co., LP/
Mr. Rick Wyly
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Originat Signed By
Arthur Etherly, III
Manager, CMT
AE/Inc
2424 STUTZ DR '* SUI]E 400 · DALLAS, TX 75235 '* TEl [214] 350 5600 · FA× [214] 350 0019
GEOTECHNICALAND r~ I~ r~l I I p
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Parer
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 220
REG PROJECT NO. 12468
SAMPLE DATE: 01-31-06
TECHNICIAN: Contractor
PAGE: 1 of 1
Location of Sample
Set Number I Location I Quantity Represented
1 Curb N/A
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
N/A N/A 3000
Test Results
Set Cylinder
N~. I ID
8073
8073
8073
8073
Age @ Total Load
Date Tested Test lbs.
02-07-06 ~ 132550
02-28-06 148880
02-28-06 146170
Hold
Compressive Average
Strength p.s.i. I Strength. p.s.L
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. I ID Slump Sample Air Temp. Temp. Entrainment Number
1 8073 N/A N/A N/A N/A N/A N/A
Mail
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
Cadence McShane Corporation/
Mr. Bobby Paret
Commerce Construction Co., LP/
Mr. Rick Wyly
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
Northwestern Investment Mgmt./
Mr. Ernest Willmore
Stewart Consulting Associates/
Mr. Mike Smith
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [2141 350 $~
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Arthur Ethedy, III
Manager,
AE/cr~
'~'~4] 350 0019
GEOTECHNICAL AND [~ ~ I--1 LJ F;~
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
est Commerce Center
~<oad and Airline I~oaa
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
REPORT NO. 226
REPORT DATE: 02-28-06
REG PROJECT NO. 12468
DATE OBSERVED: 02-16-06
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
[ Items Observed:
Paving: 50-65'S and 100-200'W from S.E. corner of
Building A.
~--~There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
BW/rs
2424 STUTZ DE. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · t^x [214] 350 0019