Loading...
Amberpoint BP 2R-LR060227CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0200 Service Date: February 14, 2006 'lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report D~te~ ~:~hrll~rv 77 ?mr~ Project: ~ AmberPoint Business Park ' ~u~lclings4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 3:20pm Plant: 7 Supplier: Lattimore Materials Co. Truck No: 1851 Ticket No: 7161230 Mix I.D. No.: 1851 WaterAdded Onsite Before Test: 0Gallons Water Added Onsite After Test: 0 Gallons Sample Information Date Cast: February 14, 2006 Time: 4:20pm Technician: Barry Cuble Weather Conditions: Sunny, mild, winds Accumulative Yards: 8/8 Placement Method: Direct Discharge Sample Locations: See Placement Location Placement Location: Manhole Tops at St. Lat. C2, C1, D, Line D, Vault Top; NE corner Field Test Data Test Result Slump, inches: 5.50 Air Content, %: 5.8 Concrete Temperature,o F: 73 Ambient Temperature,o F: 71 Plastic Unit Weight, pcf: 144.0 Laboratory Test Data set Specimen Diameter Area Specification 3-5 3-6 Date Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 Services - Tested (day~. (lbs) ~_~ _ 02/21/2006 [7'~4,160 02/21/2006 ~ 91,130 Average (7 Days) 3,280 03/14/2006 28 4 03/1~,~ 28 Obtain samples of fresh concrete at the ~Jorm required field tests and cast compressive strength samples. Technician: Barry Cuble Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Reviewed by: Hus~d, P.E. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials, Senior Project Manager _FIELD DENSITY TESTING Report Number: 94051418.0181 Service Date: February 8, 2006 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: Project: Project No.: February 27, 2006 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppe[I, TX 94051418 Material Information Material Laboratory No. Test Method Description and Classification Lab Test Data Optimum Max. Lab Water Dry Unit Content Weight (%) (pcf) Proiect Requirements Water Minimum Dry Content Unit Weight (%) (% compaction) I 514180003 ASTM D 698 Reddish brown sandy clay 2 514180001 ASTM D 698 Brown clay w/sand 3 514180001 ASTM D 698 Brown clay w/sand Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elev. No. (inches) 3" Water Line 543 50' N & 400' E of NW corner of Bulding #4 Final 1 6 3' Water Line 544 50' N & 200' E of NW corner of Building #4 Final 1 6 Water Line 545 50' N & 50' E of NW corner of Building #4 Final 2 6 Waste Water 546 30' S & 300' W of NE corner of Building ~ 2' BFG 3 6 547 30' S & 300' W of NE corner of Building ~4 Final 2 6 548 30' S & 100' W of NE corner of Building #4 2'BFG 3 6 549 30' S & 100' W of NE corner of Building #4 Final 2 6 550 30' N & 300' W of SE corner of Building #-4 2' BFG 3 6 551 30' N & 300' W of SE corner of Building #4 Final 2 6 552 30' N & 60' W of SE corner of Building #4 2' BFG 3 6 553 30' N & 60' W of SE corner of Building ~4 Final 2 6 Electrical Line 14.8 19.0 19.0 112.3 -2/+2 95 101.2 -2/+2 95 101.2 >/= +3 93 Water Dry Unit Dry Unit Content Weight Weight (%) (pof) (% compaction) 14.1 112.0 100 14.9 111.5 99 18.7 100.6 99 23.6 95.2 94 19.1 99.5 98 23.4 94.8 94 19.8 99.1 98 23.7 95.3 94 20.6 99.9 99 23.2 95.1 94 20.4 99.5 98 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. FIELD DENSITY TESTING lrerracon Client:Transwestern Commercial Services Project Number:94051418 Report Number: 94051418.0181 Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elev. No. (inches) 554 80' N & 80' W of NE corner of Building ~ 2' BFG 1 6 555 80' N & 80' W of NE corner of Building ¢f-4 Final 1 6 556 80' N & 200' W of NE corner of Building ~- 2' BFG 1 6 557 80' N & 200' W of NE corner of Building #4 Final 1 6 Water Dry Unit Dry Unit Content Weight Weight (%) (pc0 (% compaction) 14.0 110.6 98 14.7 110.4 98 15.1 111.8 100 15.3 111.2 99 Datum: BFG = below final grade Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method~,STM D2922, ASTM D3017 Technician: Armando Rendon Field Results Repoded To: Superintendent Report Distribution: ~ (1) Transwestern Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX . Husseln H usaa , P E (1) Rogers O*Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0204 Service Date: February 15, 2006 'lrerracon 8901 Carpenter Fn,vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 10:29am Plant: On-site Supplier: Potter Concrete Truck No: 118 Ticket No: 103008 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 5.50 Air Content, %: 5.0 Concrete Temperature,o F: 70 Ambient Temperature,o F: 65 Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter No. Area ID (inches) (sq. inches) 1 6.00 28.27 2 6.00 28.27 1 3 1 4 Sample Information Date Cast: February 15, 2006 Time: 10:35am Technician: Al Rodriguez Weather Conditions: Mild Accumulative Yards: 40 Placement Method: Direct Discharge Sample Locations: 100' S of Building along Building Line 2.9 Placement Location: Pavement, S of Building #4 Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM Cl 38 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/22/2006 7 113,860 4,030 02/22/2006 7 112,000 3,960 Average (7 Days) 4,000 03/15/2006 28 03/15/2006 28 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0204 Service Date: February 15, 2006 1 rEfral:l:ln 8901 Carpenter F~/y, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 11:56am Plant: On-site Supplier: Potter Concrete Truck No: 108 Ticket No: 103023 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 4.50 Air Content, %: 5.5 Concrete Temperaturep F: 72 Ambient Temperature,o F: 68 Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 2 4 Sample Information Date Cast: February 15, 2006 Time: 12:10pm Technician: Al Rodriguez Weather Conditions: Mild Accumulative Yards: 180 Placement Method: Direct Discharge Sample Locations: 50' S of Building along Building Line 4.0 Placement Location: Pavement, S of Building Specification 3-5 3-6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Date Test Load Strength Tested (days) (lbs) (psi) 02/22/2006 7 114,650 4,050 02/22/2006 7 139,980 4,950 Average (7 Days) 4,500 03/15/2006 28 03/15/2006 28 Maximum Compressive Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AAS HTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0204 Service Date: February 15, 2006 Client: mranswestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 12:18pm Plant: On-site Supplier: Potter Concrete Truck No: 118 Ticket No: 103028 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 4.00 Air Content, %: 5.0 Concrete Temperature,o F: 76 Ambient Temperature,o F: 69 Plastic Unit Weight, pcf: Laboratory Test Data Set specimen Diameter Area No. ID (inches) (sq. inches) 3 1 6.00 28.27 3 2 6.00 28.27 3 3 3 4 Sample Information Date Cast: February 15, 2006 Technician: Al Rodriguez Weather Conditions: Warm Time: 1:00pm Placement Method: Direct Discharge Sample Locations: 40' S of Building along Building Line 6.0 Placement Location: Pavement, S of Building//4 Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM Cl 38 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/22/2006 7 94,470 3,340 02/22/2006 7 113,530 4,010 Average (7 Days) 3,680 03/15/2006 28 03/15/2006 28 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 3 of 6 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0204 Service Date: February 15, 2006 'lrl ffacon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.; g4051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 1:56pm Plant: On-site Supplier: Potter Concrete Truck No: 118 Ticket No: 103044 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 5.50 Air Content, %: 5.0 Concrete Temperaturep F: 76 Ambient Temperature,o F: 70 Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 4 1 6.00 28.27 4 2 6.00 28.27 4 3 4 4 Sample Information Date Cast: February 15, 2006 Time: 2:10pm Technician: Al Roddguez Weather Conditions: Accumulative Yards: 390 Placement Method: Direct Discharge Sample Locations: 108' S of Building along Building Line 8.0 Placement Location: Pavement, S of Building #4 Specification 3-5 3-6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (ps0 02/22/2006 7 92,790 3,280 02/22/2006 7 98,030 3,470 Average (7 Days) 3,380 03/15/2006 28 03/15/2006 28 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, pedorm required field tests and cast compressive strength samples. The tests were per[ormed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418~0204 Service Date: February 15, 2006 'lrefracon 5901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 2:22pm Plant: On-site Supplier: Potter Concrete Truck No: 127 Ticket No: 103049 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 4.00 Air Content, %: 5.0 Concrete Temperature,o F: 78 Ambient Temperature,o F: 73 Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 5 1 6.00 28.27 5 2 6.00 28.27 5 3 5 4 Sample Information Date Cast: February 15, 2006 Time: 2:55pm Technician: Al Rodriguez Weather Conditions: Accumulative Yards: 440 Placement Method: Direct Discharge Sample Locations: 95' S of Building along Building Line 10.0 Placement Location: Pavement, S of Building #4 Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/22/2006 7 116,200 4,110 02/22/2006 7 118,860 4,200 Average (7 Days) 4,160 03/15/2006 28 03/15/2006 28 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0204 Service Date: February 15, 2006 'lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 3:18pm Plant: On-site Supplier: Potter Concrete Truck No: 118 Ticket No: 103058 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 5.50 Air Content, %: 5.0 Concrete Temperature,o F: 80 Ambient Temperature,o F: 74 Plastic Unit Weight, pcf: Laboratori/ Test Data Sample Information Date Cast: February 15, 2006 Time: 4:15pm Technician: Al Rodriguez Weather Conditions: Warm Accumulative Yards: 530 Placement Method: Direct Discharge Sample Locations: 85' S of Building along Building Line 12.5 Placement Location: Pavement, S of Building #4 6 3 6 4 Specification Test Method 3-5 ASTM O143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Stren~.th No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 6 1 6.00 28.27 02/22/2006 7 93,190 3,300 6 2 6.00 28.27 02/22/2006 7 90,930 3,220 Average (7 Days) 3,260 03/15/2006 28 03/15/2006 28 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Al Rodriguez Report Distribution: Transwestem Commercial Services (1) O'Brien & Assoc t'~'"~ J (1) (1) Cily of Coppell TX (1) TechniStructures Reviewed by: . (1) City of coppelJ TX Hussein H. Abusaad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0128 Service Date: January 27, 2006 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'lrerracon 8901 Carpenter Frwy, Ste #100 Dalias, Texas 75247 (214) 630-1010 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi ~ 28 Days Batch Time: 4:06am Plant: 2 Supplier: Potter Concrete Truck No: 101 Ticket No: 102439 Mix I.D. No.: 7723 Sample Information Date Cast: Technician: Weather Conditions: Accumulative Yards: Placement Method: Sample Locations: Placement Location: January 27, 2006 Daniel J. Drogos Clear, calm 130/300 Direct Discharge See Placement Location Time: 4:25am Pavement (approximately 300' x 60') Slab; approximately 450' E of NorthPoint Parking Lot Entrance in SW corner of Job Site Field Test Data Test Result Slump, inches: 5.25 Air Content, %: 3.4 Concrete Temperaturep F: 65 Ambient Temperature,o F: 53 Plastic Unit Weight, pcf: 143.6 Laboratory Test Data Set specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 Services - Specification Test Method 3-5 ASTM C143 3-5 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) 02/03/2006 7 105,680 3,740 02/24/2006 28 136,560 4,830 02/24/2006 28 153,730 5,440 5,140 Average (28 Days) 4 03/24/2006 56 Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods, This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 3 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0128 Service Date: January 27, 2006 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi @ 28 Days Batch Time: 4:48am Plant: 2 Supplier: Potter Concrete Truck No: 107 Ticket No: 102446 Mix I.D. No.: 7723 Sample Information Date Cast: January 27, 2006 Time: 5:06am Technician: Daniel J. Drogos Weather Conditions: Cloudy, cool Accumulative Yards: 200/300 Placement Method: Direct Discharge Sample Locations: 210' E & 55' N of SW corner of Slab Placement Location: Pavement (approximately 300' x 60') Slab; approximately 450' E of NorthPoint Parking Lot Entrance in SW corner of Job Site Field Test Data Test Result Slump, inches: 5.50 Air Content, %: 4.2 Concrete Temperaturep F: 60 Ambient Temperature,o F: 46 Plastic Unit Weight, pcf: 143.4 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 6.00 28.27 Services - Specification Test Method 3-5 ASTM C143 3-5 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/03/2006 7 104,130 3,680 02/24/2006 28 144,690 5,120 02/24/2006 28 139,900 4,950 5,040 Average (28 Days) 4 03/24/2006 56 Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0128 Service Date: January 27, 2006 'lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi @ 28 Days Batch Time: 6:23am Plant: 2 Supplier: Potter Concrete Truck No: 107 Ticket No: 102454 Mix I.D. No.: 7723 Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 3.8 Concrete Temperaturep F: 60 Ambient Temperature,o F: 39 Plastic Unit Weight, pcf: 143.8 Laboratory Test Data set Specimen Diameter Area No. ID (inches) (scI. inches) 3 1 6.00 28.27 3 2 6.00 28.27 3 3 6.00 28.27 3 4 Sample Information Date Cast: January 27, 2006 Time: 6:37am Technician: Daniel J. Dmgos Weather Conditions: Cloudy, cool Accumulative Yards: 273/300 Placement Method: Direct Discharge Sample Locations: 284' E & 45' N of SW corner of Slab Placement Location: Pavement (approximately 300' x 60') Slab; approximately 450' E of NorthPoint Parking Lot Entrance in SW comer of Job Site Specification 3-5 3-5 Date Tested Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Stren~.th (days) (lbs) (ps~) 02/03/2006 7 110,240 3,900 02/24/2006 28 156,620 5,540 02/24/2006 28 151,110 5,340 Average (28 Days) 8,440 03/24/2006 56 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Daniel J. Drogos Repod Distribution: (1) Transwestern Commercial Services (1) O'erien & Assoc H~~usa (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX . ad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0136 Service Date: January 27, 2006 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: February 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 2:20 pm Plant: 3 Supplier: Lattimore Materials Co Truck No: 5022 Ticket No: 3208140 Mix I.D. No.: 1261 Water Added Onsite Before Test: 5Gallons Water Added Onsite After Test: 0 Gallons Sample Information Date Cast: Technician: Weather Conditions: Accumulative Yards: Placement Method: Sample Locations: Placement Location: January 27, 2006 Kudret Aksu Cloudy 8/8 Direct Discharge Sta. 3+20.30 Time: 3:30 pm Inlet Tops: Three (3) at Sta. 0+31.25; Two (2) at Sta. 0+30.45; Three (3) at Sta. 3+20.30 Field Test Data Test Result Slump, inches: 3.00 Air Content, %: 4.5 Concrete Temperature,o F: 60 Ambient Temperature,o F: 58 Plastic Unit Weight, pcf: 144.2 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 Services - Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/03/2006 7 105,050 3,710 02124/2006 28 132,420 4,680 02/24/2006 28 146,840 5,190 4,940 Average (28 Days) 4 03/24/2006 56 Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Kudret Aksu Report Distribution: (1) Transwestem Commercial Services (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX H usaad, P.E. (1) Rogers O'Brien Conslru¢fion Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of I WATER INJECTION OBSERVATION 'l rracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: Location: 02/27/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #5 See attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0235 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Field Results Report To: Technician: Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99acs (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon WATER INJECTION OBSERVATION SKETCH 'lFerracon 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: 02/27/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0235 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Not to Scale Building #5 400' 30'>~ T > 170' 720' N