Loading...
Amberpoint BP 2R-LR060224Date of Service: 02/24/06 Report No.: Client No.: 50854 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Services: Drawings Utilized: 94051418.0221 94051418 ~berlSoin~k t~uildhl~;g-W, > and 6 505 South Royal Lane Coppell, TX Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Civil C1.01, Legend "reinforced with No. 3 bars 18-inch on center each way" Locations/Items Observed: Pavement, See attached sketch Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED I CORRECT INCORRECT ITEMS OBSERVED CORRECT iNCORRECT iTEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column T~e Spacing & Type Bar Size X~ Proper Bar Placemen~ X Siirrup Spacing & Type Bar Grade X Propedy Tied j~ Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Discrepancies/Comments: Any discrepanc~nd were corrected at the time of this observation unless otherwise Field Results Report To: Technician: D. Drogos Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX B/~.n Construction Co ~ ~(1 ~,~chniStructures Hus(~. ~busaad, P.E. Senior Project Manager 309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0125 Service Date: January 26, 2006 'lrerracon 8901 Carpenter Fn,vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 VV Dallas TX 75244 Report Date: February 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppel[, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi @ 28 Days Batch Time: Plant: 2 Supplier: Potter Concrete Truck No: Ticket No: Mix I.D. No.: 7723 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,o F: Ambient Temperature,o F: Plastic Unit Weight, pcf: Laboratory Test Data Result Set Specimen Diameter Area No. ID (inches) (sq. inches) I 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 Sample Information Date Cast: January 26, 2006 Time: Technician: Sampled by contractor Weather Conditions: Placement Method: Direct Discharge Sample Locations: Placement Location: Pavement - Parking Lot, SW corner Specification 3-5 3-5 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/02/2006 7 80,730 2,850 02/23/2006 28 158,420 5,600 02/23/2006 28 156,020 5,520 Average (28 Days) 5,560 03/23/2006 56 Comments: Not tested for plastic unit weight Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0125 Service Date: January 26, 2006 'lrerracon 8901 Carpenter Fr~vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi @ 28 Days Batch Time: 8:44am Plant: 2 Supplier: Potter Concrete Truck No: 103 Ticket No: 102412 Mix I.D. No.: 7723 Field Test Data Test Result Slump, inches: 5.25 Air Content, %: 4.5 Concrete Temperaturep F: 56 Ambient Temperature,o F: 68 Plastic Unit Weight, pcf: 146.2 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 6.00 28.27 2 4 Sample Information Date Cast: January 26, 2006 Time: 9:19am Technician: Daniel J. Drogos Weather Conditions: Cloudy, calm Accumulative Yards: 327 Placement Method: Direct Discharge Sample Locations: Approx. 315' E & 30' N of SW corner Placement Location: Pavement - Parking Lot, SW corner Specification 3-5 3-5 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/02/2006 7 104,560 3,700 02/23/2006 28 169,330 5,990 02/23/2006 28 167,040 5,910 Average (28 Days) 5,950 03/23/2006 56 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Daniel J. Drogos Report Distribution: (1) Transwestern Commercial Services (1) O'Brlen & Assoc (~J~,-~,~L,,,-/ (1) city of Coppell TX (1) TechniStructures Reviewed by: (1) City of Coppell TX Huss~ein H. Abusaad, P.E. (1) Rogers O'Brien Construction Co Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0126 Service Date: January 26, 2006 '] reffacorl 8901 Carpenter Fr,,w, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: February 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 2:28pm Plant: 3 Supplier: Lattimore Materials Co Truck No: 806 Ticket No: 3208055 Mix I.D. No.: 1261 Water Added Onsite Before Test: 0Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 3.7 Concrete Temperaturep F: 71 Ambient Tempemture,o F: 58 Plastic Unit Weight, pcf: N/A Laboratory Test Data set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Sample Information Date Cast: January 26, 2006 Technician: Ira S. Haynes Weather Conditions: Cloudy Accumulative Yards: 10/15 Placement Method: Direct Discharge Sample Locations: Line A @ Sta. 1+25.34 Placement Location: Inlet Time: 3:35pm Specification 3-5 3-6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/02/2006 7 100,120 3,540 02/02/2006 7 94,370 3,340 Average (7 Days) 3,440 02/23/2006 28 120,770 4,270 02/23/2006 28 125,180 4,430 Average (28 Days) 4,350 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Ira S. Haynes Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Assoc ~ (1) City of Coppell TX (1) TechniSlructures Reviewed by: ~ _ (1) city of Coppell TX (1) Rogers O*Brien Construction Co Hussein H. Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein ere only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: O2/24/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #5 See attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0223 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Field Results Report To: Technician: J. Johnson Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructure$ Hussein H. Abusaad, P.E. Senior Project Manager WATER INJECTION OBSERVATION SKETCH 'lrerracon Consultin~ Engineers & Scientists 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: 02/24/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0223 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Not to Scale Building #5 70,I 400' 30'~( 50' 170' 720' Not to Scale N E