Loading...
Amberpoint BP 2R-LR060222WATER INJECTION OBSERVATION "lrerfacon Da[las, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: Location: 02/22/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #6, see attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0225 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien Jowell Procedure: On this date, a Terracon technician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: l0 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X h~jection pressure 50 to 200 psi at manifold. X h~jection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Field Results Report To: Technician: J. Johnson Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX (1) Rogers O'Brien Construction Co (1) O'Brien &Assoc (1) TechniStructures Hus,~busaa~, P.E. Sen[or Project Manager 99pdr This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of Terracon. WATER INJECTION OBSERVATION SKETCH lreffacon 8901 Carpenter Frwy,. Suite Dallas, Texas 75247 (214} 630-1010 Date of Service: 02/22/06 Report No.: Client No.: 50854 Project No.: Client: Transwestem Commercial Services Project: 5001 Spring Valley Rd StP 600 W Dallas, TX 75244 Not to Scale 94051418.0225 94051418 )dnberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Building #6 27~2~0~ 12/21/06 2/20/06 Pass #1 2/21/06 Pass #2 E~ ]Pass#2 iii!!! i~ii¢!l~ i i ~r~ :;~S ~ 2/21/06 Pass ~1 < 420' > 1 170' N S