Loading...
Amberpoint BP 2R-LR060221WATER INJECTION OBSERVATION 'lrerfacon Dallas, Texas 75247 (214) 630-1010 Date of Service: Client No.: Client: Location: 02/21/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Building #6, see attached sketch Report No.: Project No.: Project: General Contractor: Injector: 94051418.0226 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Rogers-O'Brien lowell Procedure: On this date, a Terracon tectmician observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 1st & 2nd No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X h~j ection downward in 18 inch intervals. X Total depth of injection was 7 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X Comments: Field Results Report To: Technician: J. JollTISOn Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 99pdt (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wril~en approval of Terracon. WATER INJECTION OBSERVATION SKETCH 'li rracon Consulting EnRJneers & Scientists 8901 Carpenter Pn~y, Suite #100 Dallas, Texas 75247 (214) 630-1040 Date of Service: Client No.: Client: 02/21/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0226 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Not to Scale Building #6 420' 170' N S