Amberpoint BP 2R-LR060221WATER INJECTION OBSERVATION
'lrerfacon
Dallas, Texas 75247
(214) 630-1010
Date of Service:
Client No.:
Client:
Location:
02/21/06
50854
Transwestem Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Building #6, see attached sketch
Report No.:
Project No.:
Project:
General Contractor:
Injector:
94051418.0226
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Rogers-O'Brien
lowell
Procedure:
On this date, a Terracon tectmician observed the injection of water at this site. During the
injection process, the following observations were recorded.
Pass No.: 1st & 2nd No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
h~j ection downward in 18 inch intervals. X
Total depth of injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Field Results Report To:
Technician: J. JollTISOn
Report Distribution:
(1) Transwestern Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
99pdt
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wril~en approval of Terracon.
WATER INJECTION OBSERVATION SKETCH
'li rracon
Consulting EnRJneers & Scientists
8901 Carpenter Pn~y, Suite #100
Dallas, Texas 75247
(214) 630-1040
Date of Service:
Client No.:
Client:
02/21/06
50854
Transwestem Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94051418.0226
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Not to Scale
Building #6
420'
170'
N
S