Amberpoint BP 2R-LR060220WATER INJECTION OBSERVATION
'l rerracon
Consultl,~ Engineers & scientists
8901 Carpenter Frwy, Suite #100
Dallas, Texas 75247
(214) 630-1010
Date of Service:
Client No.:
Client:
Location:
02/20/06
50854
Transwestem Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Building #6, see attached sketch
Report No.:
Project No.:
Project:
General Contractor:
Injector:
94051418.0227
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Rogers-O'Brien
Jowell
Procedure:
On this date, a Terracon teclmician observed the injection of water at this site. During the
injection process, the following observations were recorded.
Pass No.: 1st No. of Probes: 4 Probe Length: 10 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth o f injection was 7 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Field Results Report To:
Technician: J. Johnson
Report Distribution:
(1) Transwestem Commercial Services
(1) City of Coppell TX
(1) City of Coppell TX
99pdr
(1) Rogers O'Brien Construction Co
(1) O'Brien & Assoc
(1) TechniStructures
Hussein H. Abusaad, P.E.
Senior Project Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wri[ten approval of Terracon
WATER INJECTION OBSERVATION SKETCH
lrerracon
Date of Service:
Client No.:
Client:
02/20/06
50854
Transwestem Commercial Services
5001 Spring Valley Rd Ste 600 W
Dallas, TX 75244
Not to Scale
Report No.:
Project No.:
Project:
94051418.0227
94051418
AmberPoint Business Park
Buildings 4, 5 and 6
505 South Royal Lane
Coppell, TX
Building #6
150'--~
Pass #1 ]
120'
170'
420'
N
wq_.E
S