SS9901-CS060206Turner Collie & Braden
17300 Dallas Parkway, Suite 1010, Dallas, Texas 75248
¥ 972.735.3000 F 972.735.3001 www.tcb.aecom.com
Transmittal
Date
To
From
Project reference
Transmitted via
February 6, 2006
Rick O'Dell
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Erika Cooper~
52803716.04000^103
Courier
We are sending you the following:
Number of Copies
1
1
1
1
Description
for valve support at 30-inch resilient wedge gate valve,
Can-Fer
pricing
Can-Fer pricing for 2 clevis pipe hangers
Can-Fer pricing for removal and replacement of 16-inch piping
Can-Fer pricing for generator feeder and manual transfer switch --
modifications
Draft O&M manual for odor control units
Remarks:
Rick,
Attached are copies of the pricing received from Can-Fer. The pricing provided for the valve
support, clevis hangers and removal and replacement of 16-inch piping appears reasonable based
on the information provided. We did not request the pricing for the generator feeder and manual
transfer switch modifications from Can-Fer, so I am unfamiliar with this item. Please let me know if
you need any additional input from TCB on the submitted pricing.
Also enclosed is a draft O&M manual for the odor control units. We are in the process of reviewing
this manual. Can you pass this along to Glenn and/or Ted to see if they have any comments prior
to Can-Fer submitting the final O&M manuals?
Please feel free to call me with any questions or comments.
Serial Letter No.
Contract No. SS 99-01
Engineer:
TurnerCollie&Braden
17300 Dallas Parkway Suite 1010
Dallas,TX 75248
Contractor:
CAN-FER Construct]on Company
110~1 Grisspm Lane
Dallas,TX 75229
Change Order Proposal -0003
Deforest Rd. & Sandy Lake Rd. Lift Station Improvements
Date: February 2,2006
Work DescHpt]on:
Iea. Valve suppo;t @30-inch resilient wedge gate valve in valve vault
TOTALS:
Labor Material Equipment Subcontractor
I$ 220-40 I $ 342'26 I S I $ I
~AN-FER Insurance 1.4%
Subtotal
)verhead(Home Office) - 8.5% Subcontracted Work
Subtotal
Profit Subcontracted Work 6.0%
Subtotal
Overhead(Home Office) - 8.5%Self Pedormed Work
Subtotal
Profit-12% Self Per[orr'ned
Subtota~
Bond ~,, 1.6%
Total
$562.7z
$7.88
$570.60
$48.50
$619.10
$37.15
$650.24
$0.00
$0.00
$0.00
$656.24
$10.50
$666.74
*** day time extension.***
Work DesCription:
Iea Valve suppor~ @3~-inch resilient wedge gate valve in valve vault
.... M---~-~ $1700 $25.50 $
NON-TAXED MATERIAL Q'"~'~'~ UNI"~'~'~- UNIT PRICE ~ TOTAL
-- S295 9~ ~ 29596
Double D Fasteners $oo0 T --
'AXED MATERIAL Q"'~"~'~ UNI"'~'~-~ ~ TOTAL
-- $o.o~ _$
$oo0 $~
$
LS 1.~ 1.~
EQUIPMENT Q'-'-'~-~'~ ---- '~UNIT '~"TE TOTAL__
$
SUBCONTRACTOR
Packing Slip#; 7532
Order#: 6516
Double D Fasteners
4455 Hint Way Dallas, TX 75236
Telephone (214) 337-8901 Fax (214) 337-7423
CAN-FER CONSTRUCTION
678 DEFOREST ROAD
DEFOREST P- N CARTHU R
COPPELL, TFXA~
Customer F~x: 972-484-4223
PO: Shipped: Ship Via: Dele; Due Det~.~: ....
]OB 04044 PREFA3D OUR TRUCK 3~nuaP/30, 2gf16 .lanua~ .~a, zuua
Parts Placed on Customer Order 65t6 ~ _~_--------
PO TM:mi CoSt: $29536
PO Total Weight: 3,69
Ordered
PI kfl led
http://www, dsd.tcchnology.com/dfl/s038__order_report_clisplay.php?key=%241%24V%2F,.. 1/30/2006
£22t~l~B~2L6 ~ S,'a3N3/SW-~ d 39El-lOd c2:-c'$ 900~/0£/I0
Serial Letter No.
Contract No. SS 99-01
Engineer:
TurnerCollie&Braden
17300 Dallas Parkway Suite 1010
Dallas,TX 75248
Contractor:
CAN-FER Construction Company
1103'1 Grissom Lane
Dallas,TX 75229
Change Order Proposal -0005
Deforest Rd. & Sandy Lake Rd. Lift Station Improvements
Date: February 2,2006
Work Description:
Remove and replace 16" piping
TOTALS:
Labor Material Equipment Subcontractor
$ 4,966.02 1 $ 442-671 $ 4'°6°'°61 $ 1,660.00
$5,388.94
$75.45
$5,464.39
$464.47
$5,928.86
$355.73
$6,284.59
$0.00
$0.00
CAN-FER Insurance 1.4%
Subtotal
Overhead(Home Office) - 8.5% Subcontracted Work
Subtotal
Profit Subcontracted Work 6.0%
Subtotal
3verhead(Home Office) - 85%Self Performed Work
Subtotal
~rofit-12% Self Performed
Subtotal $0.00
Subtotal $6,284.59
~ond ¢, 1.6% $100.55
Total $6~386.I a
*** __2__ day time extension.***
Work Description:
Rems)ye and replace 16" piping
:rinse Benefits ~ 8%
INON-TAXED II~ATERIAL QTY UNIT UNIT PRICE TOTAL
LF $22.5O $
$0.00 $
$0.00 $
0 $0.00 $
Subtotal - Equipment i $$259.0074000
ISUBCONTRACTOR
Hanson Pipe
UNIT UNIT PRIii. O0
LS $1~95000
LS $0.00
LS $0.00
LS
TOTAL
I $ ~,sso.oo I
Serial Letter No.
Contract No. SS 99-01
Engineer:
TurnerCollie&Braden
17300 Dallas Parkway Suite 1010
Dallas,TX 75248
Contractor:
CAN-FER Construction Company
11031 Gdssom Lane
Dallas,TX 75229
Change Order Proposal -0004
Deforest Rd. & Sandy Lake Rd. Lift Station Improvements
Date: February 2,2006
Work Description:
Furnish and install 2ea pipe clevis hangers
TOTALS:
AN-FER Insurance 1.4%
Subtotal
verhead(Home Office) - 8.5% Subcontracted Work
Subtotal
Profit Subcontracted Work 6.0%
Subtotal
Overhead(Home Office) - 8.5%Self Performed Work
Subtotal
Profit-12% Self Performed
Subtotal
Subtotal
Bond ~, 1.6%
Total
Labor Material Equipment Subcontractor
$ 2~°'461 $ ~53.$415I$
$374.3(
$5.2~
$379.54
$32.2(
$41f.8~
$24.7'
$435.5!r
$0.00
$0.00
$0.00
$436.51
$6.98
$443.40
*** day time extension.***
Work Description;
Furnish and install 2ea pipe clevis hangers
LABOR RT HRS OT HR$ UNIT RT RATE OT RATE TOTAL
project Manager 05 MH $4500 $45.0¢ $ 2250
MH $3750 $375¢ $ 3750
Superintendent MH $3375 $337-= $
Craft Supt MH $2500 $375£ $ 50.00
Foreman MH $1800 $27.0( $
Carpenter MH $22.00 $33.0( $
Operator-Crane MH $1700 $25.5£ $
Operator MH $1800 $27.0( $ 3600
Pipe Layer MH $1200 $18.0( $
Laborer MH $2200 $330( $
Field Engineer MH $18 0O $270C $
Field Engineer Asst. MH $15 00 $225C $
Rodman $ 146.00
Subtotal $ 62.78
Labor Burden ~[~ 43% $ 11.68
Fdn~le Benefits ~ 8% $ 220.46
Total Labor
NON-TAXED MATERIAL QTY UNIT UNIT PRICE TOTAL
)oul~le D Fasteners $107.54 $ 107.54
$0 0¢ $
$00C $
$o.oa $
~ubtotal - Non-Taxed Material $ 107.54
TAXED MATERIAL QTY UNIT UNIT PRICE TOTAL
$00c $
$0.0C $
$0.0C $
$0,0¢ $
Suatatal - Taxed Matedal + t8.25% Taxt $
IEQUIPMENT QTY UNIT RATE TOTAL
0 $0 00 SO.ut
0
0 $00:
0 $0.0;
$
tax ~ 8.25% $
rotal Equipment
TotalSUBCONTRACTOR j Q~0 0 UNITLSLS LS LS
Can-Fer Consuuction Company
11031 Grissom Lane
Dallas, TX 75229
Double D Fasteners, Inc.
4455 Mint Way
Dallas, TX 75235
(214) 337-8901
January 30, 2006
Shipped via
Quote #
123111
2
1
2
2
2
pa~t Number
Shipped
PREPAID
8" DIP FIG 590 GALV
7/g-9 X 10' ATR HDG
7/8-9 HEX NUT I-{DG
7/g ~CW HDG
7,/8-9 COUPLING NUT HDG
OUR TRUCK
Unit Price
29.67000
35.20000
0.26000
0.20000
6.04000
Total: $107.54