Amberpoint BP 2R-CS051012T H E ¢ I T Y 0 F COPPELL October 12, 2005 Mark W. McGraw, P.E. Halff Associates, Inc. 8616 Northwest Plaza Dallas, TX 75225 RE: Aanberpoint Lot 2R, Block A REVISED Fee Assessment Letter Dear Mr. McGraw: Enclosed is a revised copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. On August 23, 2005, City Council approved the award of the yearly bid for the purchase of water meters. This revised assessment reflects the new meter prices. No payment is due to the City of Coppell for Roadway impact fees due to the December 4, 2001 development agreement covering the entire Amberpoint Business Park. Water and Sewer Impact Fees are not collected until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre- construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Charlene La Mattin~ E.I.T. Graduate Engineer CC: Jennifer Armstrong, Finance Director M?~v Beth Spletzer, Administrative Secretary, Building Inspections ~i~nn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official DEVELOPMENT FEE TABLE Project: Amberpoint Lot 2R, Block A Date: 10/12/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $11,900.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $350.00 (100% due at lssuance of Water Meter) Water Meter Fee (Domestic) $613.02 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $9,491.18 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $6,720.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) l[ Construction Inspection Fee Information not Available (i 00% due prior to Start of Construction) TOTAL $29,584.20 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Amberpoint Lot 2R, Block A DATE: 10/12/2005 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 3 - 2 inch = 24 ESU's 2 - 2 inch = 16 ESU's 0 = 0 ESU's 2 - 8 inch 2.5 ESU's Total #: 42.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 7 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 3 Domestic Meter(s) @ $204.34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ $204.34 Total #: 0 Additional Irrigation Meter(s) @ $0,00 Total #: 2 Fireline Meter(s) @ $4,541.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30,00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 24 (Due prior to issuance of building permit) $280.00 ea. Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 3 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $11,900.00 $350.00 $613.02 $408.68 $0.00 $9,082.50 $90.00 $120.00 $6,720.00 $150.00 $150.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $o.oo $0.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Amberpoint Lot 2R, Block A 10/12/2005 ROADWAY IMPACT FEE: Service Area * 4 Category ** Industrial Land Use ** General Light Industrial Building Area (sf) 713,918 Development Units ** 713.92 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $227,025.92 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 100% Total Credit $227,025.92