Freeport NIP(8.1)-CS050922DEVELOPMENT FEES
=ROJECT NAME: Duke Freeport Lot 2 Block A (Freeport 14 & 15)
ENGINEER: Pacheco Koch
DRIGINATION DATE: 9/22/2005
SENT ASSESSMENT ASSESSED FEE AMOUNT PAll: DATE
9/16/2005
Water Impact Fee $9,660.00
Wastewater Impact Fee $4,480.00
Park Fee n/a
Roadway Impact-Zone $74,918.26
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Ovedime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
to be calculated
$2,908.24
$2,908.24 rb 9/22/2005
$300.00 $100.00 di 10/20/2005
$100.00
$408.68
$9,491.18 $9,082.50 di 10/20/2005
$60.00
$120.00 $60.00 di 10/20/2005
$100.00
~Subtotal to Eng.
$77,826.50 $2,908.24 $74,918.26
Total Fees Fees Paid Amount Owed
TOTALS $102,546.36 $12,150.74 $90,395.62
Prior 1'o Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.