Loading...
Freeport NIP(8.1)-CS050922DEVELOPMENT FEES =ROJECT NAME: Duke Freeport Lot 2 Block A (Freeport 14 & 15) ENGINEER: Pacheco Koch DRIGINATION DATE: 9/22/2005 SENT ASSESSMENT ASSESSED FEE AMOUNT PAll: DATE 9/16/2005 Water Impact Fee $9,660.00 Wastewater Impact Fee $4,480.00 Park Fee n/a Roadway Impact-Zone $74,918.26 Street Sign Street Light Construction Inspection EG or Bore Permit Ovedime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection to be calculated $2,908.24 $2,908.24 rb 9/22/2005 $300.00 $100.00 di 10/20/2005 $100.00 $408.68 $9,491.18 $9,082.50 di 10/20/2005 $60.00 $120.00 $60.00 di 10/20/2005 $100.00 ~Subtotal to Eng. $77,826.50 $2,908.24 $74,918.26 Total Fees Fees Paid Amount Owed TOTALS $102,546.36 $12,150.74 $90,395.62 Prior 1'o Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.