Fountain Park 1-CS 930722COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
July 22, 1993
Doug Stevens, Engineering Technician
Steven G. Goram, Director of Public Wor~
Development Fees for Fountain Park
The following fees should be assessed on the above
project.
referenced
Water Impact Fee:
30 ~" x ~" Domestic Meter/s = 30 ESU's
2 ~-- ~ ~ Irr ation Meter/s = 5 ESU's
Total 35 ESU's ~ $650.00 ea = $22,750.00
100% due prior to Council approval of final plat.
Wastewater Impact
30 - %" x ~"
Total 30
100% due prior to Council approval of
Residential meters = 30 ESU's
ESU's @ $225.00 ea = $ 6,750.00
the final plat.
Water Tap Inspection Fee
32 Connections ~ $100.00 each = $ 3,200.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
30 Connections @ $100.00 each = $3,000.00
100% due prior to issuance of building permit.
DEVELOPMENT FEES
Page 2
Utility Final Inspection Fee
30 lots ~ $50.00/lot = $1,500.00
100% due prior issuance of building permit.
Water Meter Fee (Lots)
30 - %" x ~" Residential Meters ~ $22.25 ea
100% due prior to issuance of building permit.
: $667.50
Water Meter Fee (Irrigation)
2 - 1" Irrigation Meter @ $62.10
Total
100% due prior to issuance of water meters.
ea = $124.20
= $124.20
Water Meter Deposit
Residential - 30 meters @ $30.00 ea = $900.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
2 - 1" meters @ $35.00 ea = $70.00
Total = $70.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
Development Fees
Page 3
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots @ $150.00 ea = $
Units (Multi-family) @ $75.00 ea = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined;
30 Residential Lots ~ $350.00 ea = $10,500.00
Units (Multi-family) at $350.00 ea = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
Development Fees
Page 4
for
Fountain Park
STREET SIGN ASSESSMENT
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
UNIT PRICE
$53 10
63 54
58 56
65 12
11 60
96 85
11.60
OUANTITY EXTENDED PRICE
6 $381.24
1 11.60
3 290.55
2 23.20
SIGN
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
OTHER
No Outlet
TOTAL $706.59
Cost breakdowns may be obtained from Public Works by written
request.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES.FOUNTAIN.HLP