Loading...
Fountain Park 1-CS 930722COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: July 22, 1993 Doug Stevens, Engineering Technician Steven G. Goram, Director of Public Wor~ Development Fees for Fountain Park The following fees should be assessed on the above project. referenced Water Impact Fee: 30 ~" x ~" Domestic Meter/s = 30 ESU's 2 ~-- ~ ~ Irr ation Meter/s = 5 ESU's Total 35 ESU's ~ $650.00 ea = $22,750.00 100% due prior to Council approval of final plat. Wastewater Impact 30 - %" x ~" Total 30 100% due prior to Council approval of Residential meters = 30 ESU's ESU's @ $225.00 ea = $ 6,750.00 the final plat. Water Tap Inspection Fee 32 Connections ~ $100.00 each = $ 3,200.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 30 Connections @ $100.00 each = $3,000.00 100% due prior to issuance of building permit. DEVELOPMENT FEES Page 2 Utility Final Inspection Fee 30 lots ~ $50.00/lot = $1,500.00 100% due prior issuance of building permit. Water Meter Fee (Lots) 30 - %" x ~" Residential Meters ~ $22.25 ea 100% due prior to issuance of building permit. : $667.50 Water Meter Fee (Irrigation) 2 - 1" Irrigation Meter @ $62.10 Total 100% due prior to issuance of water meters. ea = $124.20 = $124.20 Water Meter Deposit Residential - 30 meters @ $30.00 ea = $900.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 2 - 1" meters @ $35.00 ea = $70.00 Total = $70.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots @ $150.00 ea = $ Units (Multi-family) @ $75.00 ea = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined; 30 Residential Lots ~ $350.00 ea = $10,500.00 Units (Multi-family) at $350.00 ea = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works Development Fees Page 4 for Fountain Park STREET SIGN ASSESSMENT The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. UNIT PRICE $53 10 63 54 58 56 65 12 11 60 96 85 11.60 OUANTITY EXTENDED PRICE 6 $381.24 1 11.60 3 290.55 2 23.20 SIGN No Parking Speed Limit Yield Stop Street Name Stop & Street Combo OTHER No Outlet TOTAL $706.59 Cost breakdowns may be obtained from Public Works by written request. HLP/dm cc: Steven G. Goram Director of Public Works FEES.FOUNTAIN.HLP