Historic Coppell-CS051105T 14 £ C I T Y 0 F
COl'FELL
Keith M. Hamilton, P.E.
Hamilton Consulting
601 Harwood Road
Hurst, TX 76054
November 11,2005
Historic Coppell Properties Addition, Lotl 1, Block 1
Fee Assessment Letter
Dear Mr. Hamilton:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development. This assessment reflects a 50% waiver of
Roadway Impact Fees approved by the Economic Development Foundation. In the event that the
Foundation's incentive package is not approved by the City Council on December 8, 2005, the additional
50% will become due at the time of issuance of the Certificate of Occupancy.
Please make payment for the Roadway Impact Fees to the City of Coppell in the amount of $9,300.69 and
forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a
portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas
Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the
issuance ora Building Permit. Please provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Charlene La Maffina, E.I.T.
Graduate Engineer
CC:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
~ Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
Mike Lease, Structures and Interiors
DEVELOPMENT FEE TABLE
Project: Historic Cooppell Properties Addition, Lot 1, Block 1
Date: 11/11/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $5,180.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $204.34
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,586.79
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,240.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at lssuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $9,300.69 :$9,300.69
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) II
FOTAL $19,851.82
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $9,300.69
DEVELOPMENT FEE WORKSHEET
PROJECT: Historic Cooppell Properties Addition, Lot 1, Block 1
DATE: 11/11/2005
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 2 inch 8 ESU's
1 - 2 inch = 8 ESU's
0 0 ESU's
1 - 6 inch 25 ESU's
Total #: 18.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #:
3 Connections @ $5000 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: I Domestic Meter(s) @ $204.34
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) @ $204.34
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $2,38245
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8
(Due prior to issuance of building permit)
$28000 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$5,180.00
$150.00
$2O4.34
$204.34
$0.00
$2,382.45
$30.00
$60.00
$2,240.00
$50.00
$50.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
Single-family @ $000 per lot
Multi-family @ $0,00 per unit
(100% paid prior to Council approval of final plat)
$0,00
$0.00
$9,300.69
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed,
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the de, velopment contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
PROJECT:
DATE:
ROADWAY IMPACT FEE CALCULATIONS
Historic Bethel Properties Addition, Lot 1, Block 1
11/11/2005
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Office
[.and Use ** General Office Bldg.
Building Area (so 15,540
Development Units ** 15.54
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due -- (Development Units) x
'Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $18,601.38
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees
Total Credit
AMOUNTDUE:
This assessment reflects a 50% waiver of Roadway Impact Fees approved by the Economic
50%
$9,300.69
$9,300.69 I
l)evelopment Foundation. In the event that the Foundation's incentive package is not approved by
the City Coup_cil on the additional 50% will become due at tile time of issuance of the Certificate
of Occupancy.