Park West CC(11)-CS050822 (3)DEVELOPMENTFEES
~ROJECT NAME: Park West Commerce, Lot 4 Block 7 (HCA)
ENGINEER: Halff Associates
::)RIGINATION DATE: 8/22/2005
SENT ASSESSMENT
2%
4%
Water Impact Fee
Wastewater Impact Fee
Park Fee
Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection
Construction Inspection
EG or Bore Permit
Overtime Inspection
ASSESSED FEE AMOUNT PAlE
$4,480.00
$4,480.00
$273.90
Water Tap Inspection $50.00
Wastewater Tap Inspection $50.00
Water Meter (Domestic) $1,356.75
Water Meter (Fire/Irrig) $0.00
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/brig) $0.00
Utility Final Inspection $50.00
DATE
~Subtotal to En~).
$273.90 rb 10/24/2005
$50.00 di 10~8~005
$50.00 di 10~8~005
$1,356.75 di 10/28~005
$30.00 di 10/28/2005
$50.00 di 10/28/2005
$273.90 $273.90 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $10,770.65 $1,810.65 $8,960.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.