Loading...
Park West CC(11)-CS050822 (3)DEVELOPMENTFEES ~ROJECT NAME: Park West Commerce, Lot 4 Block 7 (HCA) ENGINEER: Halff Associates ::)RIGINATION DATE: 8/22/2005 SENT ASSESSMENT 2% 4% Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection Construction Inspection EG or Bore Permit Overtime Inspection ASSESSED FEE AMOUNT PAlE $4,480.00 $4,480.00 $273.90 Water Tap Inspection $50.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $1,356.75 Water Meter (Fire/Irrig) $0.00 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/brig) $0.00 Utility Final Inspection $50.00 DATE ~Subtotal to En~). $273.90 rb 10/24/2005 $50.00 di 10~8~005 $50.00 di 10~8~005 $1,356.75 di 10/28~005 $30.00 di 10/28/2005 $50.00 di 10/28/2005 $273.90 $273.90 $0.00 Total Fees Fees Paid Amount Owed TOTALS $10,770.65 $1,810.65 $8,960.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.