DR9503-LR 960521 TRINITY ENGINEERING TESTING CORPORATION
: ................. " 2772 We~ Commerce Dallas. Texas 75212
TETCO
TO: RENAISSANCE CONTRACTOR. INC. PROJECT: MISC. TESTING
1402 CORINTH - LB 114 ANDY BROWN PARK
DALLAS. TX 75215 TETCO f~2881
DATE: 5-21-96
REPORT # 596438
CONCRETE FOR: BOX CULVERT
CUBIC YARDS POURED: 10 CY DESIGN IDENTIFICATION: 6.0 SACK W/R AIR
READY MIX PLANT: LA'CrlMORE MATERIALS CO PLANT fl3
TIME OF POUR: START: 3:00 PM FINISH: 6:00 PM
CONCRETE TEMPERATURE RANGE: 89 TEMPERATURE RANGE: 95
SLUMP RANGE: 7" ENTRAINED AIR RANGE: NA
TEST CYLINDER IDENTIFICATION: AP 1 - 4
TECHNICIAN: R.B. McMILLAN
TIME: 3.0 HOURS
REMARKS: CONCRETE DID NOT ARRIVE UNTIL 4:10 PM.
AT THIS TIME. THE SLUMP APPEARED TO BE
ABOUT AN 8 TO 9" SLUMP.
COPIES TO: 2-CLIENT
Al-tN: ANGELA DOMINGUEZ
James H. Thompson. C.E.T.