Denton Tap 1A-CS050629 (2)DEVELOPMENT FEES
PROJECT NAME: Denton Tap Development (Wachovia Bank)
ENGINEER: LA Cares & Assoc
OR G NAT ON DATE: 6/29/2005
SENT ASSESSMENT ASSESSED FEE AMOUNT PAlE DATE
Water Impact Fee $700.00
Wastewater Impact Fee $0.00
Park Fee n/a
Roadway Impact-Zone n/a
Street Sign
Street Light
Construction Inspection $4,045.34 $4,045.34 rb 9/30/2005
EG or Bore Permit
Overtime Inspection
Water Tap inspection $50.00 $50.00 10/6/2005
Wastewater Tap Inspection $0.00
Water Meter (Domestic) $0.00
Water Meter (Fire/Irrig) $3,371.21 $3,371.21 10/6/2005
Meter Deposit (Domestic) $0.00
Meter Deposit (Fire/Irrig) $30.00 $30.00 10/6/2005
Utility Final Inspection $0.00
~Subtotal to En~. $4,045.34 $4,045.34 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $8,196.55 $7,496.55 $700.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.