Loading...
Denton Tap 1A-CS050629 (2)DEVELOPMENT FEES PROJECT NAME: Denton Tap Development (Wachovia Bank) ENGINEER: LA Cares & Assoc OR G NAT ON DATE: 6/29/2005 SENT ASSESSMENT ASSESSED FEE AMOUNT PAlE DATE Water Impact Fee $700.00 Wastewater Impact Fee $0.00 Park Fee n/a Roadway Impact-Zone n/a Street Sign Street Light Construction Inspection $4,045.34 $4,045.34 rb 9/30/2005 EG or Bore Permit Overtime Inspection Water Tap inspection $50.00 $50.00 10/6/2005 Wastewater Tap Inspection $0.00 Water Meter (Domestic) $0.00 Water Meter (Fire/Irrig) $3,371.21 $3,371.21 10/6/2005 Meter Deposit (Domestic) $0.00 Meter Deposit (Fire/Irrig) $30.00 $30.00 10/6/2005 Utility Final Inspection $0.00 ~Subtotal to En~. $4,045.34 $4,045.34 $0.00 Total Fees Fees Paid Amount Owed TOTALS $8,196.55 $7,496.55 $700.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.